|
Phaneul', P.E.
<br />ND TRANSIT ENGINEERING
<br />N G E R
<br />than 16 years. of experience In 0 wide range of transportation end
<br />iduding regional ITS planning and systems engineering. She has
<br />tions for a variety of technologies including video walls, traffic signal
<br />rough her work on regional and local ITS projects, she has
<br />takehold'ers such as the Federal Highway AdmInIstratloo, Jog&]
<br />agencies, arid FF-MA, She is adept at assessing the needs of the
<br />ode Into on -the -ground solutions,
<br />Professional Credentials
<br />Master of science, Civil Engineering � Transportation, Georgia Institute of Technology
<br />Master` Of 011y and Regional Planning, Georgia.. InstItutoof Technology
<br />Bachelor of $61 , once, Civil and Environmental Engineering, University of California, Berkeley
<br />Professional Engineer In California (ft63123)
<br />Relevant Rperlence,
<br />A On -Call Civil Engineering Professional Services,
<br />Son Bernardino County, CA — Project Englnear�
<br />A City of Culver City, Traffic Control System
<br />(KIT86), Culver City, CA — Deputy Project
<br />Managar�
<br />A City of Malibu, PacificCoast Highway (PPH)
<br />Signal System Improvements Project, Malibu,
<br />CA — Project Engineer.
<br />A City of Ban Mateo, Downtown Parking
<br />Technology Implementation, San Mateo, CA —
<br />Project Engineer.
<br />A Citywlde Traffic Signal Equipment and
<br />Infrastructure Assessment Study, Rancho
<br />Mirage, CA —Project Engineer,
<br />A OCTA, Brookhorst Street TLSP (8-0012-4),
<br />Orange County, CA — Project Engineer.
<br />A V�S. 101 Freeway Cap Preliminary Feasibility
<br />Study, SCAG 2% Compass Blueprint, Venture
<br />County, CA — Project Manager.
<br />A LA Metro, Wilshire Bus Rapid Transit (ORT)
<br />Before end After Study, Los Angeles, CA —
<br />Project Manager.
<br />,d Best Practices In Arterial Speed Management.
<br />Pasadena, CA — Project Engineer.
<br />,d Transit Priority System Phase 2/ATMS Phase 3,
<br />Santa Monica, CA — Project Engineer,
<br />.4 California ITS Architecture and System Plan,
<br />Statewide, CA — Project Engineer.
<br />A Coltrane District 7, Historic Arroyo Seco
<br />Parkway Strategic Program (CMAS), Los
<br />Angeles, CA —Project Engineer.
<br />A Caltrans, Connected Corridors Program and
<br />Corridor System Management/Operations Pilot
<br />Project, Statawlde� CA — Project Manager,
<br />.d City. of Anaheim ITS Master Plan (aka Anaheim
<br />Traffic; Management Center TIVIC),Ansheirri,
<br />CA — Project Engineer,
<br />.4 City of Commerce KITSO (ATM$), City of
<br />Commerce, CA — Project Engineer.
<br />• Downey Traffic Management Center (TMC)
<br />Assessment Downey, CA —Project Engineer.
<br />• Downtown Paso Robles Parking and Master
<br />(Sperific) Plan, Paso Robles, CA — Project
<br />Engineer.
<br />.4 ITS Integration Plan for Goods Movement,
<br />Gateway Cities Area, CA — Project Manager.
<br />• Pasadena SAFETEA�LU - Parking Guidance
<br />and Information Systems Integrator, Manager,
<br />and Design (TMO), Pasadena, CA -- Project
<br />Engineer,
<br />• Real Time Parking Information System
<br />(Formerly known sa Design, Implementation,
<br />and Integration of a DIMS), Culver City, CA —
<br />Project Manager.
<br />.A Rast-Time Beach Parking Project and DIVIS,
<br />Santa Monica, CA — Project Engineer.
<br />25E-54
<br />Kimillanyto Horn
<br />
|