|
0REW
<br />MANAGER
<br />)to than 27 years of professional experience In civil ongIneerjpg
<br />nIng. design, and construction of transportation facilities. His primary
<br />been In the Oros$ of roadway planning and final design associated
<br />intorrhongesi at -grade intOrsootionsi rallWay grado.si.aparations,
<br />served as project manager for the City of Santa Ana 0 ri-Call far
<br />project marlaooment track record combined Wth technical kn ledge
<br />and skilf. He recently iorved a's ASCE President for the Orange County Branch, which demonstrates both
<br />his dedication to the engineering community As well As the respect he has gamered amongst hI& peers,
<br />Professional Credentials
<br />Bachelor of Science, Civil Snglneerino, Colifemla State Polytechnic University, Pomona
<br />Professional 5riginear In California (W031) and Utah �#316106w2202)
<br />American PoNlo Works.AssoclOtloh, Morritier
<br />American Society of Civil Engineers i(ASCE�), Board Member
<br />Institute of Transportation Engineers, Member
<br />Relevant Expedience
<br />A County of Orange, On -Call Archlivol/Engineer
<br />Design Support Services (26107), Orange
<br />County, CA — Project MAnager,
<br />.A City of Corona On -Cell Trafflo and Transportation
<br />Services, Corona, CA — Project Engineer
<br />,d City of Fontana On -Call Pavement
<br />Rehabilitation/UtIllity Design, Fontana, CA —
<br />Project Manager
<br />,d On -Call Civil Engineering Professional Services,
<br />San Bernardino County, CA — Project Englriee�
<br />.4 On -Call Traffic and Civil Engineering Services,
<br />(industry), City of Industry, CA — Project Manager
<br />A OCTA, Preliminary Engineering and
<br />Envirommontal Documentation for 17th Street
<br />Grade Separation Project, Orange County, CA —
<br />Project Manager
<br />A ACE Construction Authority, Phase 11 Grade
<br />Separations PS&E. Fullerton Road Grade
<br />Separation, City of Industry, CA — Project
<br />Manager
<br />A Anaheim Rapid Connection (ARC) Streetcar,
<br />Anaheim, CA — Project Manager
<br />.A Azusa Avenue/Amar Road Intersection
<br />Improvements, West Covina, CA — Project
<br />Engineer
<br />A Azusa/Gale Intersection Analysis, City of Industry,
<br />CA — Project Manager
<br />• Baseline Road/Laurel Avenue Intersection
<br />Widening, Fontana, CA — ProjertManager
<br />• City of Anaheim, Gene Autry Way
<br />Improvements (1-6 to State College Blvd.)
<br />State College Blvd. Improvements (West Side),
<br />Anaheim, CA — Principal -In -Charge
<br />• California State Univorelty-Long Beach, West
<br />Campus Turnaround Drainage (Veteran Affairs),
<br />Long Beach, CA — Project Manager
<br />• City of Buena Park, SR DI/Eleach Blvd WB ExIt
<br />Ramp, Buena Park, CA — Project Manager
<br />• CSU Long Beach, East Campus Road - Safety
<br />Improvements, Long Beach, CA —QC/QA
<br />Reviewer
<br />.A Diamond Bar Prospectors Road Street
<br />Rehabilitation Project, Diamond Bar, CA —
<br />Project Manager
<br />,d East Coast Highway Signal Rehab Design,
<br />Newport Beach, CA — Project Director
<br />.A Firestone Boulevard Improvements, Buena
<br />Park, CA— Project Manager
<br />,d Pavement Rehabilitation (Task Order Under On -
<br />Call), Pomona, CA — Project Manager
<br />.A Traffic Flow Improvement Study of Artesia
<br />Boulevard from k5 to Beach Boulevard, Buena
<br />Park, CA —Project Manager
<br />25E-1 15
<br />K i m leny,)>) H o r n
<br />
|