Laserfiche WebLink
Katie Galloway, P.E. <br />DRAINAGE AND WATER QUALITY <br />Katie specializesin hydrology and other water related services such as stermwater <br />management and. best managament practices. Kattabas been Involved in wet utility <br />design, storm drain.design, water quplity analysis, water quality reports, hydrology <br />analysis, and task management. Katie Is proficient In a variety of software packages such as <br />Mlow-Statloo, AutoCAD Civil 3d, SformCAD, InRoods, FlowMiaster, Culvettiviaster and ProjeotWiss, <br />Professional Credentials <br />Master, Applied Ocean Science (Mechanical Engineering), University of California, San Diego <br />Bachelor of Science, Civil and Environmental Engineering, University of Maryland <br />Professional Engineer In California (04222) <br />American Society of Civil Engineers (ASCE), Member <br />Ellginoers Without Borders, Member <br />Relevant Experience <br />• Mission Avenue Streetsoope -A <br />Greah/Complete Streate, Oceanside, CA — <br />Project.EngIneer <br />• National City, Community Corridors <br />Improvements, 4th Street, National City. CA — <br />Analyst <br />,d ACE, Phase 11 Grade Separations P$,&E, <br />Fullerton Road Grade Separation, City of <br />Industry, CA — <br />• East County Bus Maintenance Facility matter <br />Plan and Construction Documents, Son Diego, <br />CA — Project Engineer <br />• Euclid Avenue Pedestrian & Bicycle <br />Enhancements, National City, CA — <br />• Groton Casino - Wilfred Avenue O"Ite <br />Improvements, Rohnert Park, CA — Analyst <br />,A VoIgt Drivelf-S North Coast Corridor (NCC) <br />Improvements (P80), San Diego, CA — <br />Project Engineer <br />• Willow Street Bridge Replacement Phase 2, <br />Chula Vista, CA — Analyst <br />• Hayward I-880ISR 92 Reliever Route, Hayward, <br />CA — Analyst <br />• 1.21SNon Buren Blvd Interchange PA&ED and <br />PS&E Phases, Riverside County, CA — Analyst <br />,d I-SlGenesoe PRIED, PS&E and. Construction <br />Phase Services (CPS), San Diego, CA — <br />Analyst <br />A Martin Lother King Community-Orlented Skate <br />Park (aka Sidlowir4dor Skate Park), El Centro, <br />CA — Analyst <br />.4 Palm Ave. and 1-1305 Interchange Widening <br />(BrIdge), Ban Diego, CA — Analyst <br />A 'Rancho Coronado Villages Design Services - A, <br />PublictPrIvate Partnership, San Marcos, CA — <br />Project Engineer <br />.4 RCTID, 1-10 Bypass, Riverside County, CA — <br />Project Engineer <br />• Rehabilitation of Willow Street Bridge over the <br />Sweetwater River, Chula Vista, CA — Project <br />Engineer <br />• Safari Park Wastewater Treatment Plant <br />Expansion (6ka Water Pipeline Upgrades Lind <br />Safarl Park Grant Support), San Diego, CA <br />Project Engineer <br />• SANDAG, Final Design of the South Line <br />Freight Rail Improvements, San Diego, CA — <br />Project Engineer <br />• SANDAG, Mid -Coast - 100% Final Design <br />Phase, sub to PS, San Diego, CA — Project <br />Engineer <br />• SANDAGIMTS Light Rail Transit (LRT) Renewal <br />Project — Blue Line Stations, Son Diego, CA — <br />Analyst <br />• UCSD Traffic Study for 1-5/GlIman Drive <br />Advanced Technology Bridge project, San <br />Diego. CA — Rrojeot Engineer <br />25E-1 25 <br />Kim I ewlyo)) Horn <br />