|
euf, P.E.
<br />qSIT ENGINEERING —
<br />ire of experienoo in a wide range of transportation and
<br />onal IT$ planning and,systems opgInearing, $he has
<br />irlety of tinohnologiles Including video walls, traffic signal
<br />A on regional Mid local ITS projects, she has
<br />such as the Federal HighwayAdnilrilStratl0h, local
<br />rid FEMA. She Is adopt at assessing the needs of the
<br />stakeholders and translating those n6eds Into on-the,ground solutions,
<br />Professional Credentials
<br />Master of Science, Civil Engineering , Transportation, Georgia Institute of Technology
<br />Master of City and Regional Planning, Georgia Institute of technology
<br />Bachelor of Science, ClvII and Environmental. Engineering, University of California, Berkeley
<br />Professional Engineer In California 1#03123)
<br />Relevant ExperlenCe
<br />.d On -Coll Civil Engineering Professional rpervIces,
<br />San Bernardino County, CA —Project Engineer.
<br />• City of Culver City, Traffic Control System
<br />(KITSO), Culver City, CA — Deputy Project
<br />Manager.
<br />• City of Malibu, Psofflo. Coast Highway (PCH)
<br />Signal System Improvements.Projeot, Malibu,
<br />CA — Project Engineer.
<br />• Cry of San Mateo, Downtown Parking
<br />Technology Implomontallon, Son Mateo, CA —
<br />Project Engineer,
<br />• Citywids Trafflo Signal Equipment and
<br />Infrastructure Assessment Study, Rancho
<br />Mirage, CA —Project Engineer.
<br />• OCTA, Brookh urst Street TLSP (8-0612-4),
<br />Orange County, CA — Project Friginaer.
<br />• U.S. 101 Freeway Cap Preliminary Feasibility
<br />Study, SCAG 2% Compass Blueprint, Ventura
<br />County, CA — Project Manager.
<br />• LA Metro, Wilshire Bus Rapid Transit (BRT)
<br />Before and After Study, Los Angeles, CA —
<br />Project Manager.
<br />• Best Practices In Arterial Speed Management,
<br />Pasadena, CA — Projeol Engineer.
<br />• Transit Priority System Phase 21ATMS Phase 3,
<br />Santa Monica, CA— Project Engineer.
<br />• California ITS Architecture end System Plan,
<br />Statewide, CA — Project Engineer.
<br />• 0altrans District 7, Historic Arroyo Seco
<br />Parkway Strategic Program.,(CMAS), Los
<br />Angeles,, CA — Project Engineer.
<br />• Caltrans, Connected Corridors Program and
<br />Corridor System Manogoment/Operstlops Pilot
<br />Project, Statewide, CA — Project Manager.
<br />• City of Anaheim ITS Master Plan (eke Anaheim
<br />Traffic Management Center TIVIC), Anaheim,
<br />CA — Project Engineer.
<br />• City of Commerce KIT80 (ATMS), City of
<br />Commerce, CA — Project Engineer,
<br />• Downey Traft Management Center (TMC)
<br />Assessment, Downey, CA — Project Engineer.
<br />• Downtown Paso Robles Parking and Master
<br />(Speolfla) Plan, Paso Robles, CA — Project
<br />Engineer.
<br />• ITS Integration Plan for Goods Movement,
<br />Gateway Cities Area, CA — Project Manager.
<br />• Pasadena SAFETFA�LU - Parking Guidance
<br />and Information Systems Integrator, Manager,
<br />and Design (TMO), Pasadena, CA — Project
<br />Engineer.
<br />• Real Time Parking Information System
<br />(Formerly known as Design, Implementation,
<br />and Integration of a DMS), Culver City, CA —
<br />Project Manager,
<br />• ReakIlme Beach Parking Project slid DMS,
<br />Santa Monica, CA — Project Engineer.
<br />25E-1 29
<br />Kimley*Horn
<br />
|