Laserfiche WebLink
Chris Iser, P.E., LEED AP <br />STRUCTURAL SERVICES - TASK MANAGER <br />Chris has nearly '16 years of experience on a variety of projects, Including building <br />structural and Pavement assessments, parking facility design and repair, vehicular <br />andporlestirlon.bridge, design and repairi culvert design,. roodwaylotreetscape <br />Improvements, and other ancillary transportation support structures. ChrIW responsibilities have Included <br />planning, structural design, production of plans and specifications, and construction phase services for a <br />wide range of project types. His desIgn and assessment experience encompasses structures of <br />reinforced concrete, precast/ prestressed concrete, post-tengloned concrete, and structural stool for a <br />wide variety of project and client types. Chris also recognizes the correlation b�etwaen sustainabillty and <br />practicality and applies,this to every project. <br />Professional Credentials <br />Master of and Bachelor of Sclefts, Civil Engineering, Clemson University <br />Professional Engineer In CA (00317). 80 (028099), NC (#35111), TN (#00527-8) <br />LEW AP,�Leodarshlp In Energy and Environmental Design) <br />American Society of Civil Engineers, Member <br />International Parking Institute, Advisory Council, SustainabilltyroQmmittee, Consultants Committee <br />Green Parking Council, Crodentl4ling Committee <br />Relevant Experience <br />A Boyside District, 3rd Street Promenade <br />Downtown Parking Study, Sonto Monica, CA — <br />Project Engineer _ , <br />A Firestone Boulevard Improvements, Buono <br />Park, CA— Project Manager <br />A City,of Anaheim, Gone Autry Way Improvements <br />(1-6 to State College Blvd.) & State College Blvd. <br />Improvements (West Side), Anaheim, CA <br />A Pavement Rehabilitation (Task Order Under on - <br />Call), Pomona, CA — Project Manager <br />A Traffic Flow Improvement Study of Artesia <br />Boulevard from 1-5 to Beach Boulevard, Buena <br />Park, CA — Project Manager <br />A 0 Gold Une Des1go-Build Wayside Energy <br />Storage Substructure (WESS) Project, Los <br />Angeles, CA —Project Engineer <br />.4 Comprehensive Parking Analysis, Santa Ana, <br />CA — Project Engineer <br />A Callfomla State University -Long beach, West <br />Campus Turnaround Drainage (Veteran Affairs), <br />Long Beach, CA — Project Manager <br />A City Of Buena Padc, SIR PI/Besah Blvd WB Exit <br />Ramp. Ruens Park, CA —Project Manager <br />A Patton Street Pocket Park (Parks for People), <br />Los Angeles, CA — Project Engineer <br />A CSU Long Beach, East Campus Road - Solely <br />Improvements, Long Beach, CA — QC/QA <br />• Diamond Bar Prospectors Road Street <br />Rehabilitation Project, Diamond Bar, CA — <br />Project Manager <br />• �ast Coast Highway Signal Rehab Design, <br />Newport Beach, CA — Project Director <br />• Valley Transportation Authority PARCS, Silicon <br />Volley, CA — Project Engineer <br />• Santa Fe Christian School Parking Dock, Solana <br />13each, CA — Project Engineer <br />• Benyessa Station Parking Structure, Son Jose, <br />CA — Project Engineer <br />• California State University, Sacramento Parking <br />Structure Condition Assessments, Sacramento, <br />CA —Project Engineer <br />• Lower Pacillo Avenue Parking Study, Santa <br />Cruz, CA — Project Engineer <br />• Milpitas Station Pedestrian Bridge over <br />Montague Expressway, Milpitas, CA — Project <br />Engineer <br />• Richmond TransitVIllage Parking Garage <br />(BART), Richmond, CA — Project Engineer <br />25E-143 <br />I rn I ev, >>>Horn <br />