|
Chris Iser, P.E., LEED AP
<br />STRUCTURAL SERVICES - TASK MANAGER
<br />Chris has nearly '16 years of experience on a variety of projects, Including building
<br />structural and Pavement assessments, parking facility design and repair, vehicular
<br />andporlestirlon.bridge, design and repairi culvert design,. roodwaylotreetscape
<br />Improvements, and other ancillary transportation support structures. ChrIW responsibilities have Included
<br />planning, structural design, production of plans and specifications, and construction phase services for a
<br />wide range of project types. His desIgn and assessment experience encompasses structures of
<br />reinforced concrete, precast/ prestressed concrete, post-tengloned concrete, and structural stool for a
<br />wide variety of project and client types. Chris also recognizes the correlation b�etwaen sustainabillty and
<br />practicality and applies,this to every project.
<br />Professional Credentials
<br />Master of and Bachelor of Sclefts, Civil Engineering, Clemson University
<br />Professional Engineer In CA (00317). 80 (028099), NC (#35111), TN (#00527-8)
<br />LEW AP,�Leodarshlp In Energy and Environmental Design)
<br />American Society of Civil Engineers, Member
<br />International Parking Institute, Advisory Council, SustainabilltyroQmmittee, Consultants Committee
<br />Green Parking Council, Crodentl4ling Committee
<br />Relevant Experience
<br />A Boyside District, 3rd Street Promenade
<br />Downtown Parking Study, Sonto Monica, CA —
<br />Project Engineer _ ,
<br />A Firestone Boulevard Improvements, Buono
<br />Park, CA— Project Manager
<br />A City,of Anaheim, Gone Autry Way Improvements
<br />(1-6 to State College Blvd.) & State College Blvd.
<br />Improvements (West Side), Anaheim, CA
<br />A Pavement Rehabilitation (Task Order Under on -
<br />Call), Pomona, CA — Project Manager
<br />A Traffic Flow Improvement Study of Artesia
<br />Boulevard from 1-5 to Beach Boulevard, Buena
<br />Park, CA — Project Manager
<br />A 0 Gold Une Des1go-Build Wayside Energy
<br />Storage Substructure (WESS) Project, Los
<br />Angeles, CA —Project Engineer
<br />.4 Comprehensive Parking Analysis, Santa Ana,
<br />CA — Project Engineer
<br />A Callfomla State University -Long beach, West
<br />Campus Turnaround Drainage (Veteran Affairs),
<br />Long Beach, CA — Project Manager
<br />A City Of Buena Padc, SIR PI/Besah Blvd WB Exit
<br />Ramp. Ruens Park, CA —Project Manager
<br />A Patton Street Pocket Park (Parks for People),
<br />Los Angeles, CA — Project Engineer
<br />A CSU Long Beach, East Campus Road - Solely
<br />Improvements, Long Beach, CA — QC/QA
<br />• Diamond Bar Prospectors Road Street
<br />Rehabilitation Project, Diamond Bar, CA —
<br />Project Manager
<br />• �ast Coast Highway Signal Rehab Design,
<br />Newport Beach, CA — Project Director
<br />• Valley Transportation Authority PARCS, Silicon
<br />Volley, CA — Project Engineer
<br />• Santa Fe Christian School Parking Dock, Solana
<br />13each, CA — Project Engineer
<br />• Benyessa Station Parking Structure, Son Jose,
<br />CA — Project Engineer
<br />• California State University, Sacramento Parking
<br />Structure Condition Assessments, Sacramento,
<br />CA —Project Engineer
<br />• Lower Pacillo Avenue Parking Study, Santa
<br />Cruz, CA — Project Engineer
<br />• Milpitas Station Pedestrian Bridge over
<br />Montague Expressway, Milpitas, CA — Project
<br />Engineer
<br />• Richmond TransitVIllage Parking Garage
<br />(BART), Richmond, CA — Project Engineer
<br />25E-143
<br />I rn I ev, >>>Horn
<br />
|