My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
University <br />Of Oallibmio, Indno <br />Clertifioation/l.loanse <br />Prat"sional gnsiftaor: bA, UT <br />Areas,of Expertise <br />WaILEcialloping Planning and <br />Neigh <br />Pipeline Planning.and Design <br />Projeot Management <br />ProArann Management <br />0 Projeet Delivery <br />- OroundwateriOupply <br />Pump Station Planning and <br />Design <br />RefservArStategaPlanhIng <br />andDesign <br />DrinkingWater <br />Experience <br />Professional Activities <br />AWWA,ASQE.AMTA <br />OA-NVAWWA, <br />CA Water Reuse Aoeoo, <br />Hazen <br />V: <br />Cindy Miller, PE <br />Wator/Waotewater Team Lead <br />go. Miller has extensive experience in the <br />planning, designand construction ofwatersupp(V, <br />treatntwo storage and convoyanoefiellitles. <br />Herassigaments; have lncludedprovIdingProgmtmmanager4entser <br />for4iso u�illiong.roundwatersupplyproject,. whichlucludes p1pelln <br />wells, pump stations� and an advanced treatment systolu for Ra <br />coatir ate reduction, ProjectMamagofbrprellallaaryand final design <br />a 28,D01),mlizrofiltration. treatment 66111% and project Managerft <br />io MOO LO./loalgxcharge groundwatertreeLtmentlilant.Ms.-Millor <br />also led numerouswaterstorago andooxiveyanceinfrawuctttreproj <br />Including design, of over lob mile& of Ductile Iwo., CMMC steel, <br />and'HDP9 pipeline., design of steel, pre-ofressedconcrete, and cast-, <br />plawconcrete storage reservoirs, tip toiO.million gallons� and numerc <br />pump station facilldes-She has led feasibility and planniq studli <br />developed tetul tent%rrocess Oaluiations and life -cycle goat evalubtic, <br />participated lo. value onglAporIng studles:aad operatioruivaluatlai <br />Shohas developed detailed designsofmaq systems and provided <br />strutimi and startup services. She has experience with differetit proje <br />delivery. methods Incladingt desIgo-bid-bulld, design -build and d <br />slgn-bulld-operate�Anance. <br />Olty of Santa Ana Well 29 1 mproverruents Altematives Analysis, <br />Santa Ana, OA <br />Principal In Charge. The City of Santa Ana owns and operato Well 2 <br />locatedat thesolltheasteorner ofFlower Street and FIrstStreet, a4face <br />to Cltyowned tennts courts. well 29 pumps directly to an existing It <br />reservoir, The existing well site Includes, the well head and discha <br />piping assemblyontrol equipment, a chlotination systel-4 In a bulldin <br />and an BCH transformer, An alternatives analysis was conducted to re <br />ommend upgrades at the site Including site Improvements, struotura <br />mechanical, and electrical upgrades. Highlights of the study Includ <br />developing three (s) alternatives for the Improved site, providing s <br />renderings for each site alternative, and developing aprellminary opt <br />ton of probable cost for the.4eqj$a and construction of each alternat <br />discussed, The City Is moving forward with, Implementing the rccona <br />mended alternative from this analysis. <br />�T <br />0 <br />ces <br />of 01 <br />s <br />S, <br />ct <br />at <br />IG <br />I -25E-148 <br />
The URL can be used to link to this page
Your browser does not support the video tag.