My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />ON -CALL ENGINEERING SERVICES 19, <br />WAFAMMO-OPIMA <br />PROJECT ORRANIZATIONAL CHART <br />Tom <br />Mark Oush, PE <br />M Ike Tsol, PE <br />Motor Ramirez, PC, SE <br />M 6 10h K68891r, PE <br />�A�ie Sohn IIC <br />J ban <br />Erini efo <br />PN <br />$OADA <br />LOCAYStATEAEALTH.- <br />PauW Fall <br />Astrid pelsoba�, PF <br />c 0 ry t-i oggLve, I t <br />OEOTECINNIGAL <br />HYDROGEOLOGY SURVEY <br />TRAIFFIC CONTROL POTHOLING <br />. Leighton <br />Richard Slade Matz surveying <br />PMK Cardno, <br />Consulting <br />Assoclates <br />Assorlates Saf r Dig <br />C-Below <br />Mr. Victor Ramirez, PIE, BE, will be the Project Manager for Structural Englneerinp. <br />Mr. Ramirez has more than 28 years of experience In structural engineering design and <br />construction support services with an emphasis In the design of water storagelwater <br />containment and water conveyance related structures, This includes: reservoirs, <br />water/wastewater treatment plants, booster pump stations, wail facilities, flow control facilities, <br />pressure reducingstations and plpellnes� Mr. Ramirez also has experience: working with this City <br />and the City Building Department since lie worked on the John Gartho Reservoir Improvements, <br />Well No, $2 Rehabilitation Study, and. San Lorenzo Sewer Lift Station. <br />Mr. Mazen Kassar, PE, will be the Project Manager for Electrical and Controls, Mr. Kassar has <br />more than 24 years of experience In electrical onginsering design and construction <br />management. His background Includes designing medium and low voltage power distribution as <br />well as Instrumentation and control systems for a wide variety of projects. He 18 also very <br />famitar wIth the City since he worked on the SA-3, SA-4 and SA-5 Flow Control Facilities, the <br />Crooke Reservoir Pump Station, and Well No, 24 Electrical Upgrades. <br />Subconsultants <br />In order to provide all the services we feel will be needed for this project, Tetra Tech has added <br />the following suboonsultents to our project team: <br />Cifyof$antaAna .5� TETRA TECH <br />25E-1 70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.