Laserfiche WebLink
ON -CALL ENGINEERING SERVICES <br />VhOrFtem�-OpiWAA <br />Pipeline Experience <br />During the last 16 years, our project team ties been involved In the design of more than 1 0o <br />miles of water, recycled Water, and, sewer mains within fully developed Areashaving extensive <br />traffic control and utility conflicts. On Page 6 of our On�Cafl Engineering Sorvites 800, <br />submitted to the Oily on October 26, 2017, Is a list of many pipeline projects designed by our <br />project team, <br />City of SontarAna Experience <br />We believe that our best reference of our expedenoe is our past. performance on projects that <br />we have Completed for the Clityi We are confident that these pot projects With the Qfiy'wIfI <br />aftost to our technical Excellent% responsive Staff, and OutcorripWo understanding of the 04yt <br />facilities. <br />Summarized belowls a quick summary of Die applicable projects that Tetra Tech has Previously <br />dofnplOted for the City: <br />• Pump Station/W - oil Projects - South Station Modifications, *Well No, 34 Modtficationsi Well <br />No. 39 and Well No. 3.61 W611 No. 24 electrical upgrbides, and Well No� 32 Rehabilitation <br />• Water Main Replacement Projects - Bristol Street WIdeolrig, Centennial Park, Warner <br />industrial, Mid Oily, Plcq-Lowall -and Central City Water Main Replacements <br />• Sewer Main Replacement Projects - Westminster and McFadden Sewer Replacements <br />i, Litt Station Projects - San Lorenzo and Maxine Litt Station Emergency Bypass <br />We ark committed toprovIdlng the City with the same high quality service that we provided on <br />these previous projects. <br />Similar Projects <br />1lip following are three projects that are similar to the sample project: <br />Mid-BaSin Injection Centennial Park Project (OCIND); These factIltios include four(4� <br />submersible bookflush pumps and motors within a vault structure, Th. e main relevance Is <br />that 00WD. was drilling and equipping well faclfiWs within the City of Santa Ana (Centennial <br />Park) and our services included obtaining the neoesewy City Permits. <br />Elizabeth Reservoir and Booster Pump Station and Water Well No. 29 (City of South <br />Gptq),r This project Included the design of the drilling and equipping of Well No. 29, <br />corresponding disinfection equipment and replacement of several thousand feet of pipe, <br />Well No. 27 Drilling and Equipping f0ity of Orange), This project Included the well <br />drilling and well equipping of -a now potable water well, Including an electrical and chemical <br />building for sodium hypochlorite treatment. <br />The requested contact Information Is Included on the following page (Client References), <br />SCHEDULE <br />Tetra Tech has the necessary resources to rapidly deploy and meet an aggressive project <br />schedule, In addition, our project team has recent well experience that plates our team high on <br />the Issues resolution learning curve. On the next page, we have Identified the key schedule: <br />City of Santa Ana is- TETRA TECH <br />01 <br />0 <br />o <br />It <br />J! <br />�J <br />25E-1 83 <br />