Laserfiche WebLink
NTETRATECH Thomas L. Epperson, PE <br />Project Manager <br />treatment systems, and an emergency generator. The facility Ind - uded the following <br />building/enclosures: wall building removable sound enclosure; pre-engineered, prefabricated <br />precast concrete electrical building; and prefabricated fiberglass insulated building for the <br />backwash pump enclosure, <br />Plant 13 Booster Statlen RehablIttetloo and Welt-22 Improvements, City of Lakewood, <br />Lakewood, CA — Project Manager for plans, specifications and cost estimate for the <br />replacement, of a 4,400 gpm bo',ostor pump station and replacement of a 1,200 gpm well pump. <br />In addition to the bootie( JpUrbp station replacement, the construction was phased so the <br />booster station was operational during construction. <br />Well 107 Replacement, IrvIne Ranch Water District, Ity,10% CA— Project Manager for the <br />preparation of II-e plans, spealficatensi cost estimate and'construction services for the drilling <br />and equipping of a potable water well In the City of Irvine. This project combined the well drilling <br />and wilt equipping phases of the ptoj6ot together. <br />Equipping of Well No, 39, City of 84nis Ana, Santa Ana, CA — Project Manager for the <br />desilan" of the equipping of Wall No. $9 and corresponding piping andsita improvements, <br />Well 70 Relitammenti lrvlho Ranch Water 01strict,, Irvine, CA — Project Manager for tho <br />drilling and equipping of a recycled water wall in the City of Irvine. <br />Irvine Desalter Project — Potable Walls 7.6,177, 107, and 110,. Irvine Ranch Water Dis.trtet, <br />IrAnot CA — Project Manager for the design and construction services of four potable Wells <br />Including drilling and equipping of each wall. <br />Burris Pump Statlon� Orange Gounty.Water District, Anaheim, CA — Project Manager for <br />the design of the new Burris Pump Station which consists of four 1,750 horsepower vertical <br />turbine pumps delivering a maximum flow rate of 200 ofs to the Santiago Basins from Burris <br />Basin. Work consists of reviewing the existing Burris Pump Station Evaluation Report, assisting <br />0CW1) With selecting a replacement option, performing final design of the selected option and <br />providing bid and construction -phase oervic9si The project also -Included unlotfe designs: - <br />190,000 cubioYards of earthwork to be completed prior to pump station construction, the <br />construction of a 55 foot diameter by 65 foot high circular Wet well which Was computer and <br />physically modeled during design for flow characteristics. and the construction of a 180,000 <br />gallon surge suppression system4 <br />Centennial Park Neighborhood Water Main improvements, City of Santa Ana, CA — Project <br />Director for approximately 20,000 linear feet of 8-Inch PVC water main to replace existing water <br />malns. <br />Central City Water Main Improvements, City of Santa Ana, CA - Project Director for <br />approximately e,600 linear feet of 6-Inch PVC water main to replace existing water mains. <br />Pico -Lowell Neighborhood Water Main Improvements, City of Santa Ana, CA — Project <br />Director -for approximately 8,200 linear feet of 8- and 12-inch PVC water main to replace existing <br />water mains, <br />Page 2 <br />25E-1 94 <br />