NTETRATECH Thomas L. Epperson, PE
<br />Project Manager
<br />treatment systems, and an emergency generator. The facility Ind - uded the following
<br />building/enclosures: wall building removable sound enclosure; pre-engineered, prefabricated
<br />precast concrete electrical building; and prefabricated fiberglass insulated building for the
<br />backwash pump enclosure,
<br />Plant 13 Booster Statlen RehablIttetloo and Welt-22 Improvements, City of Lakewood,
<br />Lakewood, CA — Project Manager for plans, specifications and cost estimate for the
<br />replacement, of a 4,400 gpm bo',ostor pump station and replacement of a 1,200 gpm well pump.
<br />In addition to the bootie( JpUrbp station replacement, the construction was phased so the
<br />booster station was operational during construction.
<br />Well 107 Replacement, IrvIne Ranch Water District, Ity,10% CA— Project Manager for the
<br />preparation of II-e plans, spealficatensi cost estimate and'construction services for the drilling
<br />and equipping of a potable water well In the City of Irvine. This project combined the well drilling
<br />and wilt equipping phases of the ptoj6ot together.
<br />Equipping of Well No, 39, City of 84nis Ana, Santa Ana, CA — Project Manager for the
<br />desilan" of the equipping of Wall No. $9 and corresponding piping andsita improvements,
<br />Well 70 Relitammenti lrvlho Ranch Water 01strict,, Irvine, CA — Project Manager for tho
<br />drilling and equipping of a recycled water wall in the City of Irvine.
<br />Irvine Desalter Project — Potable Walls 7.6,177, 107, and 110,. Irvine Ranch Water Dis.trtet,
<br />IrAnot CA — Project Manager for the design and construction services of four potable Wells
<br />Including drilling and equipping of each wall.
<br />Burris Pump Statlon� Orange Gounty.Water District, Anaheim, CA — Project Manager for
<br />the design of the new Burris Pump Station which consists of four 1,750 horsepower vertical
<br />turbine pumps delivering a maximum flow rate of 200 ofs to the Santiago Basins from Burris
<br />Basin. Work consists of reviewing the existing Burris Pump Station Evaluation Report, assisting
<br />0CW1) With selecting a replacement option, performing final design of the selected option and
<br />providing bid and construction -phase oervic9si The project also -Included unlotfe designs: -
<br />190,000 cubioYards of earthwork to be completed prior to pump station construction, the
<br />construction of a 55 foot diameter by 65 foot high circular Wet well which Was computer and
<br />physically modeled during design for flow characteristics. and the construction of a 180,000
<br />gallon surge suppression system4
<br />Centennial Park Neighborhood Water Main improvements, City of Santa Ana, CA — Project
<br />Director for approximately 20,000 linear feet of 8-Inch PVC water main to replace existing water
<br />malns.
<br />Central City Water Main Improvements, City of Santa Ana, CA - Project Director for
<br />approximately e,600 linear feet of 6-Inch PVC water main to replace existing water mains.
<br />Pico -Lowell Neighborhood Water Main Improvements, City of Santa Ana, CA — Project
<br />Director -for approximately 8,200 linear feet of 8- and 12-inch PVC water main to replace existing
<br />water mains,
<br />Page 2
<br />25E-1 94
<br />
|