Laserfiche WebLink
NTETRATECH Erin Cabatiero <br />Wall Design <br />Me, Cabalfiero has provided design engineering in various water <br />Mandan. <br />and wastewater projects including domestic vvatO pipeline$, water <br />B.S., Civil EI'Vinaeflng, <br />main replacerrisnts, gravity sower moIns, gravity forcemaini, <br />universk 6iaalifornia, Irville, <br />,pump stations, [fit stations, reinforced concrete reservoirs, steel <br />2009 <br />tank reservoirs, fio*,control ficilftles,and pressure reducing valve <br />Registrations: <br />oults—Roappo OtIOloheve,inc4qdeO.Proparptionofoonptruotibn <br />Engineer lh Training, <br />plans, specifications, 0d desigh assisted <br />California, 200a, - No. 1,31.89`1 <br />supervisors In preparingproject memorandums and. project <br />schedules; andorganized offloo technical 1krary, <br />Office: <br />IMne, Oblifornia. <br />EXPERIENCE <br />Years of E*perlenco: <br />Mild -Basin Injection; Centennial Park Design Services, Orange <br />Nine <br />County Water District, Santa Ans, CA. — Design Engineer for <br />four injection wells lobe located within Centennial Park in the City <br />Years with Tetra Tarn: <br />of Santa Ana for Orange CoUbty'Wateir District. In addition to the <br />Seven <br />engimeeringeervices.for tho four Injeotictrr Wells, thie project <br />includes the design OMM supplyplPellhe, b6oklIUM pipeline, <br />lbridge crossing, two shared facility eltes, a monitoring well site, <br />site Improvements, and paving of park access roa ds and parking <br />lots, <br />Wolf No. 29 and Elizabeth Reservoir and Booster Pump Station, City of South Gate — <br />Design Engineer for the design and oon�trtictlon support for the drilling and equipping of a new <br />2,500 gpm well, sodium hypoohlqdte facilities, andgeneralor at the well site and a 1,8 steel <br />reservoir, booster pump station consisting of three 125 hp pumps/motors at the reservoir site, <br />and about 5,000 feet of water. main replacements within the City of South Gate. The project <br />combined the well drilling and well equipping phases of the work together. <br />Well 70 Replacernent, Irvine Ranch Water.DistrIct, Irvine, CA — Design Engineer for the <br />drilling and equipping of a recycled water well In the City of Irvine. <br />Wall No. 27, City of Orange Orange, CA — Design Engineer for the drilling and equipping of <br />Wolf 27, a new potable wate�lwell (030 feet deep), The project Involved the partial demolition of <br />an existing warehouse to accommodate the footprint of the new well, Installation of a CMU block <br />control building and sodium hypochlorite building, 12.5% sodium hypoohlorite disinfection <br />facility, sound enclosure around the well head back-up generator, as well as, site and <br />landscaping Improvements. <br />Burris Pump Station, Orange County Water District, Anaheim, CA — Design Engineerfor <br />the design of the new Burris Pump Station which consists Of four 1,760 horsepower vertical <br />turbine pumps delivering a maximum flow rate of 200 ofe to the Santiago Basin$ from Burris <br />Basin. Work consisted of reviewing the existing Burris Pump Station Evaluation Report, <br />assisting O0WD with selecting a replacement option, performing final design of the selected <br />option.and providing bid and construotion phase services. The project also Included unique <br />designs: 190,000 cubic yards of earthwork to be completed prior to pump station construction, <br />the construction of a 55-foot diameter by 65-foot high circular wot well which was computer and <br />physically modeled during design for flow characteristics, and the construction of a 180,000 <br />gallon surge suppression system. <br />Page, 1 <br />25E-201 <br />