|
NTETRATECH Erin Cabatiero
<br />Wall Design
<br />Me, Cabalfiero has provided design engineering in various water
<br />Mandan.
<br />and wastewater projects including domestic vvatO pipeline$, water
<br />B.S., Civil EI'Vinaeflng,
<br />main replacerrisnts, gravity sower moIns, gravity forcemaini,
<br />universk 6iaalifornia, Irville,
<br />,pump stations, [fit stations, reinforced concrete reservoirs, steel
<br />2009
<br />tank reservoirs, fio*,control ficilftles,and pressure reducing valve
<br />Registrations:
<br />oults—Roappo OtIOloheve,inc4qdeO.Proparptionofoonptruotibn
<br />Engineer lh Training,
<br />plans, specifications, 0d desigh assisted
<br />California, 200a, - No. 1,31.89`1
<br />supervisors In preparingproject memorandums and. project
<br />schedules; andorganized offloo technical 1krary,
<br />Office:
<br />IMne, Oblifornia.
<br />EXPERIENCE
<br />Years of E*perlenco:
<br />Mild -Basin Injection; Centennial Park Design Services, Orange
<br />Nine
<br />County Water District, Santa Ans, CA. — Design Engineer for
<br />four injection wells lobe located within Centennial Park in the City
<br />Years with Tetra Tarn:
<br />of Santa Ana for Orange CoUbty'Wateir District. In addition to the
<br />Seven
<br />engimeeringeervices.for tho four Injeotictrr Wells, thie project
<br />includes the design OMM supplyplPellhe, b6oklIUM pipeline,
<br />lbridge crossing, two shared facility eltes, a monitoring well site,
<br />site Improvements, and paving of park access roa ds and parking
<br />lots,
<br />Wolf No. 29 and Elizabeth Reservoir and Booster Pump Station, City of South Gate —
<br />Design Engineer for the design and oon�trtictlon support for the drilling and equipping of a new
<br />2,500 gpm well, sodium hypoohlqdte facilities, andgeneralor at the well site and a 1,8 steel
<br />reservoir, booster pump station consisting of three 125 hp pumps/motors at the reservoir site,
<br />and about 5,000 feet of water. main replacements within the City of South Gate. The project
<br />combined the well drilling and well equipping phases of the work together.
<br />Well 70 Replacernent, Irvine Ranch Water.DistrIct, Irvine, CA — Design Engineer for the
<br />drilling and equipping of a recycled water well In the City of Irvine.
<br />Wall No. 27, City of Orange Orange, CA — Design Engineer for the drilling and equipping of
<br />Wolf 27, a new potable wate�lwell (030 feet deep), The project Involved the partial demolition of
<br />an existing warehouse to accommodate the footprint of the new well, Installation of a CMU block
<br />control building and sodium hypochlorite building, 12.5% sodium hypoohlorite disinfection
<br />facility, sound enclosure around the well head back-up generator, as well as, site and
<br />landscaping Improvements.
<br />Burris Pump Station, Orange County Water District, Anaheim, CA — Design Engineerfor
<br />the design of the new Burris Pump Station which consists Of four 1,760 horsepower vertical
<br />turbine pumps delivering a maximum flow rate of 200 ofe to the Santiago Basin$ from Burris
<br />Basin. Work consisted of reviewing the existing Burris Pump Station Evaluation Report,
<br />assisting O0WD with selecting a replacement option, performing final design of the selected
<br />option.and providing bid and construotion phase services. The project also Included unique
<br />designs: 190,000 cubic yards of earthwork to be completed prior to pump station construction,
<br />the construction of a 55-foot diameter by 65-foot high circular wot well which was computer and
<br />physically modeled during design for flow characteristics, and the construction of a 180,000
<br />gallon surge suppression system.
<br />Page, 1
<br />25E-201
<br />
|