My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 20, 201B <br />Mr, Armando Fernandez. <br />C11yof Santa Ana, Public Works Agency <br />20 Civic Center Plaza, 3rd Picot Reception, Ross Annex <br />Sonta Ana. CA 92701 <br />RE: Qualifications Proposal for RF4 llc� 17-003 <br />City bf Santa AftwOrl-Call Engineering Services <br />i Mr, Fernandez, <br />Huitt�Zollars, Inc. (11Z) has been serving in Orange 0conly for more than 30 yeom and looks forward to continuingthis relationship by supporting the <br />011yof Santa Ana with OA-Call Eng.16eeft Services, <br />the assignments described lit the Water kosaurces�ond General Engineering 10ptions A ernd�a); <br />Our recent project.bompleflont.and ongtibigprojeds hit�hllghtbd In this proposal demonstrate our team's direct exp6donce.and well planned cost- <br />effective approach with Public Works assignments. Our team has served Orange, Anabelmi rudlerlon, Huntington $each, Laguna Hills, Lagunt <br />Niguel, Mission Viejo, Santa Ana, San Clements, San Juan Capistrano, Yorbe Linda, Long Beach, Chino, Fattens, Ontario, Calabasas; and Thousand <br />Oaks. <br />Our Project Manager Miguel A. Hernamim PE. PLS, QSD brings a -proven record in rmilfi-disciplinary engineering assignments with Public Works. <br />entities. He served as Resident Engineer In the Mojave Solar Pmjectth4t built two power plants. The power plants required sewer and water <br />Improvements Including rehabilitation of several existing water wells, He also worked on the award -winning La Puts Avenue Gap Closure for Orange <br />County Public Works, Miguel understands the Importance of jamactive communication and quality control In the timely delivery of a project. He will <br />be assisted by.othor In-house professionals showcased in the team experience seotion of this proposal. <br />Our turn Is dedicated to providing high -quality products to the City of Santa Ana. This proposal Is signed by an officer with authority to bind the <br />company. Should you have any questions, please feel free to contact Migoell Hernandez at mhomandez0buitt-zollars.com or at (949) 988-5815 <br />Extension 11169. <br />Sincerely, <br />HUITT-ZOLLARS, INC <br />Marc Haslirger, PE <br />Office Manager/ Vice -President <br />CA PE No. 49158 <br />Miguel Hernandez, PE, PLS, QSD <br />Project Manager <br />CA PE No. 61378 <br />City of Santa Ana Civil Engineering Services: RFP 17-083 <br />25E-225 <br />
The URL can be used to link to this page
Your browser does not support the video tag.