My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Utility Services — Our project experience offers many projects with sower, water, and storm drain design, We have also provided dry utilities <br />coordination. We are currently working on projects that Install and/or retrofit utilities. <br />Roadway Design Specialists —Our project team has provided roadway design services for urban, rural, primary, secondary, and major roadway$. We <br />are equipped to address all option B aspects Including: <br />Conceptual Design Alternatives 0 Storm Water Management <br />Utility relocationsladjustments 0 Rehabilitation <br />Parkway Landscaping 0 I'mal Design PSH packages <br />Sound Wall and Retaining Walls Bike Path <br />Drainage <br />Trafft Engineering —We offer complete traffic engineering services. HZ has completed hundreds of traffic engineering projects. Our traffic <br />engineering staff are experts in all aspects of traffic engineering and operations. This includes: <br />0 Signing and Striping Bicycle Safety <br />0 Temporary Traffic Control Parking, access, and circulation <br />0 Schoolzones Traffic Calming Plans <br />Pedestrian Safety <br />Traffic Control — Option 0 would Include signing and striping for proposed improvements. The signing and striping would consider the proposed <br />bike path. Both project will require temporary traffic control during construction, Temporary traffic control could be deferred to construction phase <br />or it could be Included with construction documents. <br />Hydrolgilyand ilydrsolicsAnalysts— Option 8 would Include a hydrology and hydraulics analysis that assess drainage Improvements, <br />water finality compliance <br />WQMP — In accordance with MS4 Permit Guidelines <br />SWPPP - Prepares PRI)s In accordance with the requirements set forth In the NPDFS General Permitter Storm Water Discharges Associated with <br />Construction and Land Disturbance Activities. The SWPPP may also be deferred to the construction phase, <br />Reartochnical Recommendations — Our consultant will provide the required analysis to determine the street section thickness, sub -surface sails <br />classification and condition, evaluate soil properties, provide geDtechnical parameters, trench stability requirements, and backfill recommendations, <br />We will coordinate with the Cilyto make sure quality and durability are not compromised. <br />Estimates— HZ will generate quantity takeoffs and an opinion of probable construction cost for proposed project improvements, Cost estimates <br />shall Include construction, engineering, inspection, administration, rlght-of-way, and contingency. The estimate shall fie the unit price to a cog <br />Index and provide a format that Is easily updated or revised. Bid prices from recent city project shall be reviewed to verify unit prices. <br />speaffleations — 117 will utilize the City of Santa Ana standard bid specifications and edit them to fit both project requirements. This will include a <br />bid shoot showing the anticipated project quantities, <br />Construction Admialsitwilan Services <br />1. Bid Support — Assist City with bid documents, attend bid meeting, and provide bid supporL <br />2. Construction Support — Attend pre -construction meeting, provide ongoing support, and attend construction meetings as required, <br />3, Project Close Out — Utilize contractor redlines for as -built plans to prepare record plans In Micro-St8t!Dn V81 CADD and pdf format. <br />Client Satisfaction, — Huitt-Zollers achieves client satisfaction by dedicating a concise and experience team that will deliver on schedule and <br />withlabudget. A key component Is effective communication that begins with listening to the City's ideas, concerns, and goals. Ourstatusropoas <br />summarize discussions, provide follow up action items, and set dates for follow up Items. We will create a project wait plan that includes that <br />includes all critical tasks to deliver 6 design that meets expectations. We will Integrate ourselves via meetings, emalls, and conversations so that <br />we become an extension of the City's vision for the project. We Will attend community mootingto help gain acceptance, <br />HUf IT-21DLM City of Santa Ana CIVII Engineering Services: RrP 17-083 0 <br />25E-233 <br />
The URL can be used to link to this page
Your browser does not support the video tag.