My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Huitt-Zollars was retained by Orange County Public Works to prepare Letter of Design <br />Recommendations (LODR) and final construction plans, specifications and estimates <br />for the improvement of the Oso Parkway I Antonio Parkway intersection In South Orange <br />County. The $2 million project's purpose was to improve the capacity of this intersection <br />to accommodate Increased traffic resulting from continued now residential development <br />throughout the region. Capacity improvements at the intersection were as follows: <br />Antonio Parkway: Addition of a fourth southbound thru lane and a third northbound <br />laft-turn lane onto Oso Parkway <br />)> Oso Parkway. Addition of a fourth eastbound thru lane <br />Oxnard Village is an approximately GO -acre privately f unded re development project <br />located at the westerly gateway to the City of Oxnard, along the 101 Freeway. The <br />under-ottlized site contained 1950's era motel, mobile home park, retaillcommemial <br />and light manufacturing uses. This mixed use project will ultimately include 1,500 <br />residential units with row -houses, podium stacked flats, live -work units a nd luxury high <br />rise condominiums and luxury hotels. Four parking lots have already been designed <br />which included aesthetic, decorative fighting, water quality. space, enhanced paving, <br />vehicular, pedestrian and disabled access, as well as drainage challenges. In each <br />case, both a functional and aesthetically pleasing built environment resulted. The <br />project is ongoing and will continue development while serving the City of Oxnard for <br />many decades into the future. <br />RELEVANT DESIGN COMPONENTS: <br />• Street Improvements <br />• Sewer Domestic Water <br />• Reclaimed Water <br />• $term Drain <br />• Flood Control <br />• mulitple Parking Lots <br />• Landscaping <br />• water Quality <br />• Vehicular & DisabledAccess <br />HL]ITT-ZOLIARS City of Santa Ana Civil Engineering Seivices: RFP 17-083 13 <br />25E-237 <br />
The URL can be used to link to this page
Your browser does not support the video tag.