Laserfiche WebLink
Sati-rask V Pry trYfiths — Undergrounding existing powerllnes Is possible If SCE accepts proposed switch locations, As described In the <br />approach coordination with SCE would occur In two phases. Oar current scope Is limited to street design. HZ Will Coordinate with third party <br />purveyors to find feasible alignments for dry utility. The proposed alignment would be Incorporated into a conflict exhibit for evaluation. The (IN <br />coordination Is limited tothe street Improvement design period. <br />HI will utilize Ch1yofSArta Ana standard bid specifications and/or the latest edition of the Standard Specifications <br />for Public Works Construction and editthern tofit the project requirements, <br />$0.1askI.Milmates afftbable Cast— IIZ will prepare estimates of probable cost forthe proposed Improvements. <br />ft-taskA 18110(yPleos- HZ will prepare utility plans this Includes an option for potholes to investigate existing utility size and depth. Further <br />Investigation will be necessary where record information Is unreliable and thought to cause a conflict with proposed Improvements, Existing <br />manholes will be dipped where possible to verify Inverts and pipe size. Notices will be sontto Impacted utility companies and every effort will be 0 <br />made to resolve conflicts prior to 60% submittal. <br />Sub-lbsU I Iflisposition Plans— Removals are Run tied to Infrastructure within project limits <br />$0-TaskV2 Water WisfiRshablillaflanPlan <br />$0-laskJ. 13 fifisits Amprovemont Plaits -Excluded <br />V, . <br />Option A: VIcal Street Improvement set will Include; Option B: Typical Street Improvement set Will Include., <br />1. Title Shoot 1. Title Sheet 9. Signing& Strii ping Details <br />0 <br />2� Index Shoot 2. Index Shoot 10. Sound Wall Plan - (3 sheets) <br />3, Disposition Plan 3, Disposition Plan 11. Sound Wall Details <br />0 <br />4. Street Plans (If Required) 4. Street Improvement Plans (5 12, Streetfight Plan (3 sheets <br />0 <br />6, Utility Improvement Plans (2 sheets) sheets) double stacked) <br />6. Water Well Rehabilitation Plan 5. Details & Typical Cross 13. Stredilght Details <br />7, Details and'Itypical Grass Sections Sections 14. Landscape & Irrigation Plan (3 <br />6. Storm Drain Improvements — (2 sheets -double stacked) <br />sheets) 15, Landscape & Irrigation Details <br />7. Drainage Details <br />B. Signing & Striping Plans (3 <br />sheets -double stacked) <br />0 <br />TA S K K; Construction Administration Services (Optional) <br />0 <br />Silb-lask I I Bid $Dppott-- IIZ will be available to attend the pre-bld rmetl ag, Do r team wil I review contractors RFls If requested by the city <br />during the bidding ph ass, <br />Suh-Task U tonstruatlen Seoport _- HZ. will participate in construction meetings if-mscessAry.12-will review submittals and shop drawings <br />requl red to support the Construction contract, Reviews will be completed within 10 working days of receipt, Contractor cha nge orders wil I be <br />completed within two worhIng days of receipt. HZ wil be available as requested bythe City to resolve discrepancies in contract documents. HZ <br />will furnish rscessauy revisions to documents due to orrors and/or omission at no cost. <br />Subt-rask KS Record DrowIngs — The contractor shall provide as -built redlinns, HZ will revise approved plans per contractor comments to <br />produce record drawings. <br />=-1ssNX4Pro/#otC1ase-0ttt- HZ will assist In the development of the project punch list as related to the construction pockageprepared by <br />ourteam, <br />HUITT-ZOLKRS City of Santa Ana Civil Engineering Services: RFP 17-083 18 <br />25E-242 (11 <br />