Laserfiche WebLink
SAM GUHA, PHO, PE, GE <br />GPot e c ho ic. aI - Ninyo & Moore <br />Dr. Gulra is a Principal Engineer with Ninyo & Moore with diverse professional experience in geotechnical <br />engineering design, consulting, construction, and regulatory practice. ft Guha coordinates and conducts <br />gootechnical evaluations for commercial, industrial and public facilities, including airports, bridges, <br />highways, railroads, levees, public and private buildings, various plants (e.g., water treatment, bio-refining, <br />power), pipelines, reservoirs, retaining structures, and elevated, at -grade and below -grade tanks; provides <br />guidance on various analytical and numerical procedures that are undertaken fore project Including seismic <br />hazard analyses (e.g., ground motion, liquol'aGition, dynamic settlement, lateral spread, ground subsidence, <br />landsliding, etc.), site -specific responsespectra analyses, slope stabilityanalyses, analyses of sail settlement, <br />bearing capacityand earth pressures, assessmentof adverse effects of collapsible soil and expansivesoll, and <br />development of structural foundation, pavement sections and underground pipeline design criteria; provides <br />geotechnical design parameters and recommendations for shallow and deep foundations, temporary and <br />permanent retaining structures, slope stabilization techniques, mechanically stabilized earth (MSE) walls, <br />tieback anchors, soil nails, in -situ ground rennediation and earthwork; prepares and reviews geotechnical <br />reports, proposals and transmittals; reviews laboratorytest results, project plans and specifications; provides <br />supervision and technical support to project- and staff-lovel engineers and geologists; conducts quality <br />assurance/quality checks, and performs project administration and management, <br />RELEVANT PROJECT EXPERIENCE <br />Orange County Water District, Smith Basin - K11aParkCA <br />Burris and Lincoln Basin - Anaheim, CA <br />Nestor Basin/Twin takes Park, Proposed Pump Station and Basin Grading, Gootechnical Evaluation - <br />Garden 6mve, CA <br />1-10 Replacement of the Ellis Avenue Pump Station, Orange County Sanitation District - Fountain Vailiey, CA <br />Reclaimed Water Reservoir for Moulton Niguel Water District - Afiso Viejo, CA <br />Effluent Pump Station Annex — Job No, J-77, Orange County Sonitatiort District Plant No. 2 - Huntington <br />Beach, CA <br />Now Lateral Extension for Castalc Lake Water Agency - Santa Clarits, CA <br />Chula Vista Power Plant Modernization - Chula Vista, CA <br />JESUS "FREDDIE" OLMOS <br />r a v i r o n in e n I e? / - L C 0 R P <br />rreddle Dimes has more than 20 years of experience in Enviommonal Engineering and is proficient with <br />environmental undertaking of the design of streets, basins, sewer, water, storm drain, grading, and,public <br />works projects. <br />RELEVANT PROJECT EXPERIENCE <br />West Street and Citron Street Sidewalk Gap Closure Project - Anaheim, CA <br />Lincoln Avenue Widening Project - Anaheim, CA <br />to Palma Avenue at East Street Sidewalk Oap Closure Project - Anaheim, CA <br />State College Boulevard and to Palma Avenue Intersection Improvement Project - Anaheim, CA <br />HUITT-ZOLM City of Santa Ana Civil Engineering Services: RFP 17-083 <br />25E-258 <br />� 11 <br />14 <br />J <br />L <br />