My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our QA/QC program sets a procedure that ensures dellverables for both options A and B meet your expectations, k an ISO 9001:2015 <br />compliant firm, the Quality hihmagement Program serves as the foundation for continnous Improvement 10 all aspects of our work. 'For our staff <br />Quality Assurance Is mom then just a program that ensures proper Intermil review and documentation. ltisafromeofmin4vithwhlcbweappma�h <br />out work. The procedure WI(1 belp uA deliverlilgh quality plant at 30%, 60%, and final submittal. <br />Our quality assurance program comprises all activities necessary to ensure thatotolocts perform according to expectations. TheQAprogrom <br />places emphes(s�im planning control,liestilif control, computer serhare control And records. Welfistitut#)ourOApmg(amthtooghmlyinvolvcfment <br />of"perionced members, This process Olighaswit'hourpropoUl, Is formalized by project kh;� oftluid continues through project closeout via Our <br />coordination. The progrorh Will. sinsititethet All 8000P:tbUI6 IWO1 OfAIMIRY is Achieved and hishitaillied: In, o6ch design. <br />We are proposing a filkhly-spechilized team of registered professionals with a history of delivering on similar projects. A team with a bench <br />strangthurimatchedlotheindustrir. Our project manager will be assitten! by the suppofted byllify personnel, Thusta"we <br />are committing is organized so that richindontleadership Is available In critical aspects of design. . Oortoom offers Additional value because it wl 1 <br />yljofieutly� oruilyza a design it provide sustainable best <br />ADVANCEDESIGN --To Into projects, It It fifigerativato select A team thilitiMs bileft'linalmoy, <br />prepared, Our team approach will explore dosigh from all shilm med.challerigeli from now angles, grillbelp uncovor per3ptothrosthat areetea <br />overlooked. Our design process is lotenictiv.0 andrespopsive. it orgegosall stakeholders relevant to the success of the prolaQt� We havevssen. ad <br />the rottoom I <br />At the proposal stage overall project direction the stratob for project Is specified, and general Methodology Is developed. Milestones <br />ere inif with lueAsuraldo threfiries for checking progress on budget and scope completion, After award, our project manager prepares a project <br />:sRocific WorkPlmi. The ProjectWorliflon adds detail totho proposal scope of work,identifiestho projectWin eashipments and resporisibififtleg, the <br />d In criteria, Inputs and constraints forthe project, The Plan Als6s o I t goV 61 <br />prof6dbudgOtandsoliedillo,and folmotlimrag pb If &a ho or a# <br />design codes, goldolinot; And CAO standards. <br />Work Breakdown Structure - Hultt-zollats will develop a Work Aireakdown Structure (WBS) that Identifies specific tasks needed to accomplish <br />the proposed scope Of services, Wowill determine the level of effort required! foreatch discipline to complete each task undarlb.0 WBS. This effort <br />is used to establish the pToposed coMponsation for the project and helps overcome potential budget challenges, <br />DefAlledProloot Schedule— Several characteristics comprise our approach to developing and maintaining a realistic schedule. Thissiartswith <br />participation of the entire project team. It Is Imperative that the schedule be sensitive to the demands Of every discipline and client review periods. <br />Aschedule must accountfor stakeholder considerations end Include time contingenclesfor resolving unhire$een variables. Our PM is assignedthe <br />responsiblIfly of.dovelophig and trawking the project schedule. OurWBS format Allows ourPM to review budgets against associated Milestones. We <br />require that the PM update the Principal with project progress weekly. This results In a sense of urgliaoirthat will benefit each project. <br />Quality project delivery can be Impacted by many things. flowliver, there are five. areas that will demand car focus. <br />We will design both projects A and B as the City intended to design them. This will he accomplished by listening and clearly understanding your <br />expectations, We will confirm our understanding In Our negotiated scope and verify that we are on track by onducting design review meetings on <br />a regular basis from planning through final design, <br />We will design both projects A and B as the City Intended to design them. This will be accomplished by listening and clearly understanding <br />yout expectations, We will confirm our understanding In our flagellated scope and verify that we are on track by conducting design review <br />meetings on a regular basis from pennfog through final design. <br />We will meet with sub-cons"ItAnts to ensure their scope Is completo� <br />HUHT-ZOLM City of Santa Ana Civil Engineering Services: RFP 17-083 7 <br />25E-277 <br />
The URL can be used to link to this page
Your browser does not support the video tag.