My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WrityServices— Our project experience offers many projects with sewer, water, and storm drain design. We have also provided dry utilities <br />coordinatiom We are currently working on projects that Install and/or retrofit utilities. <br />Roadway Design Specialists —Our project team has provided roadway design services for urban, rural, primary, secondary, and major roadways. We <br />ore equipped to address all option B aspects Including: <br />Storm Water Management <br />Conceptual Design Alternatives 0 <br />Utility relocations/adjustments 0 Rehabilitation <br />Parkway Landscaping 6 Final Design PS&E packages <br />Sound Wall and Retaining Walls 0 Bike Path <br />Drainage <br />Traft Elriglaeorlag — We offer complete traffic engineering services. HZ has completed hundreds of traffic engineering projects, Our traffic <br />engineering staff are experts In all aspects of traffic engineering and operations, This includes! <br />Signing and Striping <br />Temporary Traffic Control <br />Schoolzones <br />Pedestrian Safety <br />Bicycle Safety <br />Parking, access, end circulation <br />Traffic Calming Plans <br />Trafflo Coniml—Option B would Include signing and striping for proposed improvements, The signing and striping would consider the proposed <br />bike path, Both project will require temporary traffic control during construction. Temporary traffic control could be deterred to construction phase <br />or It could be Included with construction documents. <br />NyttrologynodHydtailliesAgalysIs— option B would Include a hydrology and hydraulics analysis that assess drainage Improvements. <br />wafer offeNty Compliance <br />WQMP -- In 4 teardance with MS4 Permit Guide] Ines <br />SWPPP - Prepa res PRDs in accordance with the req uIrements set faith I a the NPO ES Genera I Permit for Storm Water Discharges Assool ated with <br />Construction and Land Disturbance Activities. The SWPPP may also be deferred to the constr Io ph <br />uct n ase. <br />sootachilicalRecommendaillmrs —Out consultant will providethe required amilysista detarialnethe street section thickness, sub -surface soils <br />clessIficatlon and condition, evaluate sell properties, provide geotachnical parameters, trouch stability requirements, and backfilimcommendations. <br />We will coordinate with the Cityta make sure quality and durabilityare notoompromised. <br />1 Estimates— IIZ will generate quantity takeoffs and an opinion of probable construction costfor proposed project improvements, CostestImAtes <br />shall include construction, engineering, inspection, admightration, right-of-way, and contingency. The estimate shall tie the not price to a cost <br />Index and provide a format that Is easily updated or revised. Bid prices from recent city project shall be reviewed to verify unit prices. <br />Seactficutions— HZ will ottlize the City of Santa Are standard bid specifications and editthem to fit both project requirements. This will Include a <br />bid sheet showing the anticipated project quantities. <br />Construction Administration Sarvicas <br />I . Bid Support — Assist City with bid documents, attend bid meeting, and provide bid support. <br />2. Construction Sup port —Attend pre-constructicn meeting, provide ongoing support, and attend construction meetings as required. <br />3. Project Close Out — Utilize contractor redfi nes for as -built p I a us to prepare record plans in Micro -Station V8i CADD and pdf format, <br />Client Satisfaction — fluitt-Zollars achieves client satIsfaction by dedicating a concise and experience team that will deliver on schodole and <br />withinbudget. A key component. Is effective communication that begins with listening to the City's ideas, concerns, and goals. Our status reports <br />summarize discussions, provide follow up action items, and set dates for follow tip items, We will create a project work plan that Includes that <br />includes all critical tasks to deliver a design that meets expectations. We will integrate ourselves via meetings, emalls, and conversations so that <br />vie become an extension of the City's vision forthe project. We will attend community me8fingto help gain acceptance, <br />HUITHOLM Cilyof Santa Ana Civil Engineering Services: RFP 17-083 0 <br />25E-279 <br />
The URL can be used to link to this page
Your browser does not support the video tag.