Laserfiche WebLink
MARC HASLINGER, PE <br />P!1�11eipll 1�i c/taqu - Hu,tl 1011a�s <br />Having experience in both the public and private engineering sectors, Marc Haslinger brings abroad wealth <br />of experience to his jobs. He has managed and designed numerous municipal, residential, and commercial <br />projects throughout Southern California from initial planning and feasibility studies through final design, <br />construction, and construction management, His experience has included residential, commercial, and <br />Industrial developments; potable and reclaimed water transmission mains and flood control facilities; <br />roadway improvements; and construction management, Haslinger is well -versed In the tools of construction <br />management, contract administration, planning, design, and processing. <br />Complementing Haslinge(s project management capabilities is a hands-on approach and 'technical <br />knowledge of computer programs in the area of coordinate geometry, hydraulics, hydrology, structures, <br />spreadsheets, critical path networking, management, and other tools necessary for a successful project. <br />RELEVANT PROJECT EXPERIENCE <br />Western Avenue Rehabilitation — Buene Park, CA <br />Irvine Center Drive, Sand Canyon to Barranca Parkway — kvine, CA <br />Irvine Center Drive, 1-405 Freeway to Lake Forest Drive — Irvine, CA <br />Bake Parkway, 1-405 to Irvine Center Drive — Irvine, CA <br />City of Dallas Facilities Capital Planning, Design and Construction - Dallas, IX* <br />Willow Avenue Drain — West Covina, CA <br />CARL TAYLOR, PE, LEED AP <br />Civil rogineer - fluitt Zollars <br />Carl Taylor has a strong background in public infrastructure projects. He has worked on arterial highways and <br />intersections, local and neighborhood streets, master plan and local storm drains, city and community parks, <br />trails, streetscapes, vehicular and pedestrian bridges, city halls, libraries, community centers, memorials <br />and plazas, parking lots, sewer and water facilities, and pedestrian and biGycle/pedestrian trails. During his <br />professional career, Taylor has provided plans, specifications, estimates, and construction administration <br />and support for numerous city, county, redevelopment agency, federal, and community facilities district <br />projects. <br />RELEVANT PROJECT EXPERIENCE <br />OC Parks On -Call Projects — Orange County, CA <br />Mathis Trail Repair, Aliso & Wood Canyons <br />Greek Restoration, Wagon Wheel Regional Park <br />General Development Plan, OG Zoo <br />Santiago Creekbank Repair at Arden MDdieska <br />Historic Site, Modjeska Canyon Nature Preserve <br />Tijeras Creek Trail Repair, O'Neill Regional Park <br />Trail Crossing Replacement, Santiago Oaks Regional <br />Park <br />Wagon Wheel Creek Restorations, Thomas F. Riley <br />Wilderness Park <br />FEMA Repairs, Carbon Canyon Regional <br />Park <br />• FEMA Repairs, Limestone / Whiting Ranch <br />Wilderness Park <br />• FEMA Repairs, Upper Newport Bay Nature <br />Preserve <br />• FEMA Repairs, Laguna Coast Wilderness <br />Park <br />Bakersfield National Cemetery <br />Oso Parkway & Antonio Parkway Intersection Improvements — Orange County, CA <br />Center Street — Anah6lin, CA <br />Townsend Place — Pasadena, CA <br />HUMZOLM City of Santa Ana Civil Engineering Services: RFP 17-083 <br />25E-297 <br />