Laserfiche WebLink
CSG PRoPcsAi.ToSANTAAmA <br />MILCONEPROJECT <br />WMEM =1 <br />March 20,2018 p <br />ArmandoFernandez <br />Project Manager <br />City of Santa Ana <br />Public Works Department <br />20 Civic Center Plate <br />SantaAnp, CA 92701 <br />Rot UP No. 17-098 General Engineerlogother than Water RtWurcps — op pre <br />Alan.$ (Ole One je#) <br />CSG Consullents, Inc. (CSSI Is pleased to present our proposal to provide engineering services for Mile One <br />Street Project. Our proposod team h4lan, agWrthhent of project management skills anti relevant eXporlonop <br />In roadway assessment & design, complete street, pavement management, Caltrans local assistance, traffic <br />�lgnal deslgn� latkew4y design, Otiblic outreach, Bad federal grant adniffilittratlan. CSG has provided 41miter <br />services for Many murildpalltles; throughout Callibmia. We have developed a great understanding for the <br />municipalities' needs and #xpadetlont, and have experience collaborating with Citles' staff to ensure <br />successful delivery, of theprojact. <br />Peykan AbbasA, PE, Principal Engineier, will servisas the Principal [A Chafte:end Project Manager fpr�thls ' _- - - <br />Contract, <br />Peykam Abbassi, PE, I Project Manager <br />3707 W.Garden Grove Dtvd,, Suite 100 1 Orange, CA 9286.8 <br />phone (714) 568-101011 pdyk;maV@.csgongKcom <br />Mr, Abbossl brings over 92 years of engineering management experience for public works projects. In both <br />murtlotpal government, and transitagenclo. WAbbassl previously served as the Project Alanajoerllvad <br />Eny1neerreprasenting the City qf Los AngalssforUP011 (construction phase), and Regional connector <br />1peeffirdnary design phase). The work Included establishing communication protocols and procedures to <br />respond proactIvely during Inherently fast -paced design -build project development and construction. Having <br />performed Project Management tasks similar th the requirements for the City's project has provided Mr. <br />Abbassl with the hands-on a)(0arlence and knowledge required to deliver a successful project He has <br />managed design and construction of many Infrastructure projects for the City of Los Angeles, City of Half <br />Moon Day and North County Transit District <br />CSG has teemed with Goo-Advantec, Wagner Engineering & Survey(WES), Summers/Murphy St <br />Partners(SMP), and Transpo Group. Goo-Advantec will assist the team witholl soll and pavement.related <br />testing and reports, Wagner Engthearing will provide surveying services, SMI) Inc. will perform landscape <br />architecture, and Tronspo Group will assist the project with all required traffic 5tudies, <br />We are excited about the opportunity to serve the City of Santa Ana and would welcome the opportunity to <br />talk with you further. As President, I am emp6ered to negotlat� the contract on behalf of our firm. If you <br />have any questions or need Roditional Information, please contact Mr. Abbess) at peykanm@csliengr,com or <br />(714) 568-1010. <br />Sincerely <br />Cyrus Klanpour <br />President, CSG Consultants, Inc, <br />04""11111110� <br />CSG <br />OONSULTANIS <br />1%000or <br />3707 West Garden Grove Blvd, #100, Orange, CA 92868 <br />phone (714) 568-1010 1 tax (734) 568-1028 1 www.csgengr.com <br />25E-318 <br />