Laserfiche WebLink
Ae� <br />CSGAmir MOW <br />EIT 00NOULTANTS <br />Associate Engineer N4010AW <br />UCENSES and <br />Mr. Abdollahl has over three years of engineering design and construction Inspection <br />daRtIlIFICATES <br />experience. His design background includes V variety of public works projects involving <br />laillnur in 16611, <br />pavement reharbilltation, trading, drainage system Improvements, estimates, and <br />$tire #f Wifornis <br />standard Detall Revisions. He Is knowledgeoNe In AutoCAD Civil 30. <br />RELEVANT EXPERIENCE <br />EDUCATION <br />old& of WM (W lalliertrl q <br />2016-17 Street Reskirilacing Project I City o(Stoticto", CA <br />W pu stilt U00AIV <br />M Abdollahl served Ps a design angineor fart the preparation of PS&E documen. t for the <br />j* rA <br />pavement rehabilitation project. This Pavement rehabilitation project includes hot mix. <br />. <br />asphalt Mill and fill roplate.rnerlts, pavement kose failure repairs (digouts), microsurfaerril, <br />PRo, PpsslokAL <br />PaVernant patch mod crack seallng, upgrade ADAVcomplhnnt curb ramp; adjustment to <br />AFFILIATIONS <br />existing utility facilities end morru. Montt topreposod finis.hod ofarde, roplacam ent of <br />Antrim Sedeq of.611 Inglieto (W.) <br />existing traffic signal tiptector loops, trimming of tree roots and.canoples, and Instal lation <br />140spautta 101IM410041 <br />of pavement markings and striping. <br />rice preidar, Uatalloo <br />various streets & Roads Improvement Project I c ity of m I I I b.1, &a, CA <br />Mr, Abdulsh! served as a Vresign Eflillneatfor I;Wpavemont projectwhich Involved a major <br />City arterlak, Millbrae Avenue, and a residential Street MagWIaAvqnuo, The project also <br />Included pavement daring s;mple testing surveying, pavement recommendations report, <br />traffic ho ndlino plans, ADA curb ramp upgrades, traffic signal repair and traffic detours. <br />Measure ) and. t & Annual Pavement Rehabilitation 2OX5 I C I ty a f 0 r I a d a, C A <br />As Project. Engineer, M r. Abdollahl was resportal ble far the field assessments, utility <br />company coor4lnatlon, development of PS&E dowments, and assilsted In the preparation <br />of addendurns and bid support, The Measure J & L project rehabtfiltated local/yesIderrtial <br />roads with a PC[ value less than 25.-The scope Included Identifying various depth of full, <br />depth rehabliltatflon to rehabilitate 23 local roads andtwo colle orr adswithinthec4y <br />of OrInda. <br />Millbrae Various Streets and Road Preservation I City of Millbrae, CA <br />Mr. Abdollahl assisted In preparing the PSU design along with the Caltrans Field Review, <br />Fevironmontaltioarance, Encroachment Permit, Right of Way Certification, and Caltrans <br />E76 docaments, The City bad an One Day Area Grant (OIAG) funded project that required <br />road pavement to be rehabilitated along segments of Millbrae Avenue (From ki Camino <br />Real to Old Bayshore Highway) and Magnolia Avenue (Taylor Blvd to to Cruz Avenue), <br />Ell Montv Road Preservation Project I Town of Los Altos Hills, CA <br />As Project Engineer, Mr. Abdo[lahi conducted a s6rles of field assessments regarding <br />PirvamOftt reconstruction limits, road and striped lane dimensions, concrete <br />improvements, and ADA compliance needs an Projectthat spanned 1.5 miles. Amlr also <br />assisted with the Federal Grant Administration process and coordinated with the Caltrans <br />Local Assistance department forthe entirespan of the Project. Developing the Field <br />Review, Preliminary Environmental Study (PES), E�76 Authorization for Construction, and <br />FricroachmomtPormit forms, Amir was also Able to perform quantity takeoffs for all <br />streets to assist in the development of the engineer's estimate. <br />Dairy Knolls Stair and Pathway Improvements I Town of Tiburon, CA <br />in this stair and Pathway Improvement project, Mr. Abdollahl conducted a topographic <br />survey to develop the Plans and estimate for a pathway with a staircase that connected <br />an after school daycare to an elementary school. During this prodess, MrAbdollah1was <br />asked to design up to three different approaches with a recommended choice for the <br />staircase and pathway. <br />25E-361 <br />