<br />Mr. Abdollahl has over three years of engineering design and construction Inspection
<br />daRtIlIFICATES
<br />experience. His design background includes V variety of public works projects involving
<br />laillnur in 16611,
<br />pavement reharbilltation, trading, drainage system Improvements, estimates, and
<br />$tire #f Wifornis
<br />standard Detall Revisions. He Is knowledgeoNe In AutoCAD Civil 30.
<br />RELEVANT EXPERIENCE
<br />EDUCATION
<br />old& of WM (W lalliertrl q
<br />2016-17 Street Reskirilacing Project I City o(Stoticto", CA
<br />W pu stilt U00AIV
<br />M Abdollahl served Ps a design angineor fart the preparation of PS&E documen. t for the
<br />j* rA
<br />pavement rehabilitation project. This Pavement rehabilitation project includes hot mix.
<br />.
<br />asphalt Mill and fill roplate.rnerlts, pavement kose failure repairs (digouts), microsurfaerril,
<br />PRo, PpsslokAL
<br />PaVernant patch mod crack seallng, upgrade ADAVcomplhnnt curb ramp; adjustment to
<br />AFFILIATIONS
<br />existing utility facilities end morru. Montt topreposod finis.hod ofarde, roplacam ent of
<br />Antrim Sedeq of.611 Inglieto (W.)
<br />existing traffic signal tiptector loops, trimming of tree roots and.canoples, and Instal lation
<br />140spautta 101IM410041
<br />of pavement markings and striping.
<br />rice preidar, Uatalloo
<br />various streets & Roads Improvement Project I c ity of m I I I b.1, &a, CA
<br />Mr, Abdulsh! served as a Vresign Eflillneatfor I;Wpavemont projectwhich Involved a major
<br />City arterlak, Millbrae Avenue, and a residential Street MagWIaAvqnuo, The project also
<br />Included pavement daring s;mple testing surveying, pavement recommendations report,
<br />traffic ho ndlino plans, ADA curb ramp upgrades, traffic signal repair and traffic detours.
<br />Measure ) and. t & Annual Pavement Rehabilitation 2OX5 I C I ty a f 0 r I a d a, C A
<br />As Project. Engineer, M r. Abdollahl was resportal ble far the field assessments, utility
<br />company coor4lnatlon, development of PS&E dowments, and assilsted In the preparation
<br />of addendurns and bid support, The Measure J & L project rehabtfiltated local/yesIderrtial
<br />roads with a PC[ value less than 25.-The scope Included Identifying various depth of full,
<br />depth rehabliltatflon to rehabilitate 23 local roads andtwo colle orr adswithinthec4y
<br />of OrInda.
<br />Millbrae Various Streets and Road Preservation I City of Millbrae, CA
<br />Mr. Abdollahl assisted In preparing the PSU design along with the Caltrans Field Review,
<br />Fevironmontaltioarance, Encroachment Permit, Right of Way Certification, and Caltrans
<br />E76 docaments, The City bad an One Day Area Grant (OIAG) funded project that required
<br />road pavement to be rehabilitated along segments of Millbrae Avenue (From ki Camino
<br />Real to Old Bayshore Highway) and Magnolia Avenue (Taylor Blvd to to Cruz Avenue),
<br />Ell Montv Road Preservation Project I Town of Los Altos Hills, CA
<br />As Project Engineer, Mr. Abdo[lahi conducted a s6rles of field assessments regarding
<br />PirvamOftt reconstruction limits, road and striped lane dimensions, concrete
<br />improvements, and ADA compliance needs an Projectthat spanned 1.5 miles. Amlr also
<br />assisted with the Federal Grant Administration process and coordinated with the Caltrans
<br />Local Assistance department forthe entirespan of the Project. Developing the Field
<br />Review, Preliminary Environmental Study (PES), E�76 Authorization for Construction, and
<br />FricroachmomtPormit forms, Amir was also Able to perform quantity takeoffs for all
<br />streets to assist in the development of the engineer's estimate.
<br />Dairy Knolls Stair and Pathway Improvements I Town of Tiburon, CA
<br />in this stair and Pathway Improvement project, Mr. Abdollahl conducted a topographic
<br />survey to develop the Plans and estimate for a pathway with a staircase that connected
<br />an after school daycare to an elementary school. During this prodess, MrAbdollah1was
<br />asked to design up to three different approaches with a recommended choice for the
<br />staircase and pathway.