My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Professional On -call Engineering Services City of Santa Ana <br />RFP No. 17-083 <br />major Interchanges and grade separations. Chris manages diverse teams <br />delivering project study reports, project reports and PS&E packages and <br />provide engineering services during construction. He has extensive <br />Chris Bretall, PE has more <br />knowledge of agency standards and regulatory and third -party <br />than 30 years of project <br />coordination requirements. <br />management, design and <br />oversight experience on <br />Chris has provided design and project management services for the <br />transportation projects for <br />following projects: <br />Southern California cities, <br />• Bristol Street Widening, PS&E, Santa, Ana <br />Including the City of Santa <br />• Downtown Traffic Calming, Laguna Beach <br />Ana, counties and <br />• Lincoln Avenue Widening Design, Anaheim <br />transportation agencies, such <br />• La Palma Avenue/State College Blvd, Widening, Anaheim <br />as Caltrans and OLTA, He <br />• El Toro Road/Glenneyee Street Rehabilitation, Laguna Beach <br />offers extensive knowledge of <br />• Birch Street/State College Intersection Widening, PS&E, Brea <br />agency standards, regulatory <br />• Safe Routes to School Projects, Cycle I and Cycle 7, Burbank <br />and third -party requirements, <br />• Atherton Street/Magnolia Avenue St, Rehabilitation, Long Beach <br />He has designed and <br />• Cloverfield Blvd. Widening/ Improvements, PS&E, Santa Monica <br />managed development of <br />• Columbia Avenue/Iowa Avenue Improvements, PS&E, Riverside <br />street and storm drain <br />• 1-605 Arterial Hotspots, PS&E, La Mirada and Santa Fe Springs <br />improvements, Interchanges <br />and grade separations, <br />Organizational Chart <br />Principal -in -charge <br />Stephen Barium, PE <br />3 perlence <br />81 7 yeors ex !! <br />lnd3arveyks Landscape Architecture EnVironmental Services <br />Kelsurveys, Inc. David Volz Design ECORP, Consulting, Inc. <br />Kelvin Kitacka, PLS Gary Vasquez, RLA Jesus "Freddie" Olmas <br />Geotechnical irma I ft C <br />Associated Soils Engineering, Inc, ADVANTEC Consulting Engineers, Inc. <br />Ted Riddell, PG, CEG Carlos Ortiz PF, TF, PTOE <br />ANDERSON VFNNA <br />25E-378 <br />
The URL can be used to link to this page
Your browser does not support the video tag.