Birch Street/state College Intersection Widening, PS&E, City of Brea, CA. Project manager responsible
<br />for this project that added left turn lanes to provide dual left turn Movements In the Es and WS
<br />directions on Birch and extended the length of the SBI dual left turn lanes on State College. The project
<br />also added right turn lanes for EB, WS and NO traffic, and removed/modified and replaced the raised
<br />median curbs. Right-of-way acquisition was also required.
<br />Columbia Avenue/Iowa Avenue Improvements, PS&Fp City of Riverside, CA. Project manager for the
<br />planning and final design of a new grade separation at the ONSF tracks. The project included
<br />e.,
<br />construction of a precast box girder bridge overpass with MSE Walls. Services Included traffic signal
<br />design, now sewer, water line, electrical undeforounding, storm drain, Construction of a new RCB box
<br />culvert for the Riverside Canal, extensive utility relocations and right-oll-way acquisition.
<br />Safe Routes to Schools (SRTS) Pedestrian improvements at Four Schools, Santa MQnIca, CA, Project
<br />manager for engineering design services for diff City of Santa M01"Ica's Safe Routes to School (SRTS)
<br />Pedestrian program, which Includes SRTS Improvements at four schools: John Adams and Lincoln
<br />Middle Schools, Roosevelt Elementary School, and the Will Ro ' gers Learning Community. The,
<br />Improvements Include curb extensions (bulbout&), upgraded crosswalks, rectangular rapid flashing
<br />beacons and revised traffic signal operations. The City Is utilizing Capital Improvement Project (CIP)
<br />Funds to Implement the ImproverneriM
<br />McBeen Parkway Median Alignment, City of Santa Clarita, CA. Project managerforthe preparation of
<br />an updated concept plan, final plans, t0thillcal specifications and estimate (PS&E) for proposed street
<br />improvements of the McBean Parkway, a major six -lane arterial highway In the City Of Santa Clarita
<br />that extends from Interstate 5 (1-5) on the west to Copper Hill Drive on the east with a posted speed
<br />limit of 45 mph Within the project limits.
<br />SIXATP Projects, Bureau of Engineering, City of Los Angeles, CA, Provided staff augmentation. to City
<br />staff for the pre -design, design and provision for technical assistance during construction associated
<br />with the delivery of six projects funded through the ATP that have a combined construction cost of $23
<br />million. The effort Included four Safe Routes to Schools Infrastructure Improvements projects,
<br />Hollywood Western Pedestrian Improvements and City of Los Angeles Little Tokyo Pedestrian Safety
<br />Improvements,
<br />Cloverfield Boulevard Widening and Improvements, PS&E, City of Santa Monica, CA. Project manager
<br />for the widening of Cloverfield Boulevard to allow for three travel lanes in each direction. This project
<br />was the second phase of a two-phase project and Included Cloverfleld Boulevard from Michigan
<br />Avenue to Colorado Avenue, Work Included street design, traffic signals, right-of-way engineering,
<br />property appraisals, landscape and Irrigation, street lighting and widening/narrowing of streets to
<br />Improve circulation,
<br />Railroad Avenue improvements, PS&F, City of Santa Clarita, CA. Project manager for design and right-
<br />of-way services for Improvements to Railroad Avenue. The project Included the realignment of Railroad
<br />Avenue, pavement reconstruction, drainage Improvements, the Installation of new traffic signals/street
<br />lighting, landscaping and right-of-way acquisition,
<br />Via Princesse Extension, project Study Report Equivalent (PSRE), City of Santa Clarita, CA. Project
<br />managiar responsible for the preparation of a PSRE for a 3.Q-mile extension of the Via PrIncessa
<br />between Clalbourne Lane and Rainbow Glen Drive. This new arterial roadway Is a critical link In the
<br />City's transportation network. The PSRE was prepared In response to LA Metro's Coll for Projects and
<br />Included alternative alignment studies, cost estimates, environmental analysis and traffic studies,