Laserfiche WebLink
Birch Street/state College Intersection Widening, PS&E, City of Brea, CA. Project manager responsible <br />for this project that added left turn lanes to provide dual left turn Movements In the Es and WS <br />directions on Birch and extended the length of the SBI dual left turn lanes on State College. The project <br />also added right turn lanes for EB, WS and NO traffic, and removed/modified and replaced the raised <br />median curbs. Right-of-way acquisition was also required. <br />Columbia Avenue/Iowa Avenue Improvements, PS&Fp City of Riverside, CA. Project manager for the <br />planning and final design of a new grade separation at the ONSF tracks. The project included <br />e., <br />construction of a precast box girder bridge overpass with MSE Walls. Services Included traffic signal <br />design, now sewer, water line, electrical undeforounding, storm drain, Construction of a new RCB box <br />culvert for the Riverside Canal, extensive utility relocations and right-oll-way acquisition. <br />Safe Routes to Schools (SRTS) Pedestrian improvements at Four Schools, Santa MQnIca, CA, Project <br />manager for engineering design services for diff City of Santa M01"Ica's Safe Routes to School (SRTS) <br />Pedestrian program, which Includes SRTS Improvements at four schools: John Adams and Lincoln <br />Middle Schools, Roosevelt Elementary School, and the Will Ro ' gers Learning Community. The, <br />Improvements Include curb extensions (bulbout&), upgraded crosswalks, rectangular rapid flashing <br />beacons and revised traffic signal operations. The City Is utilizing Capital Improvement Project (CIP) <br />Funds to Implement the ImproverneriM <br />McBeen Parkway Median Alignment, City of Santa Clarita, CA. Project managerforthe preparation of <br />an updated concept plan, final plans, t0thillcal specifications and estimate (PS&E) for proposed street <br />improvements of the McBean Parkway, a major six -lane arterial highway In the City Of Santa Clarita <br />that extends from Interstate 5 (1-5) on the west to Copper Hill Drive on the east with a posted speed <br />limit of 45 mph Within the project limits. <br />SIXATP Projects, Bureau of Engineering, City of Los Angeles, CA, Provided staff augmentation. to City <br />staff for the pre -design, design and provision for technical assistance during construction associated <br />with the delivery of six projects funded through the ATP that have a combined construction cost of $23 <br />million. The effort Included four Safe Routes to Schools Infrastructure Improvements projects, <br />Hollywood Western Pedestrian Improvements and City of Los Angeles Little Tokyo Pedestrian Safety <br />Improvements, <br />Cloverfield Boulevard Widening and Improvements, PS&E, City of Santa Monica, CA. Project manager <br />for the widening of Cloverfield Boulevard to allow for three travel lanes in each direction. This project <br />was the second phase of a two-phase project and Included Cloverfleld Boulevard from Michigan <br />Avenue to Colorado Avenue, Work Included street design, traffic signals, right-of-way engineering, <br />property appraisals, landscape and Irrigation, street lighting and widening/narrowing of streets to <br />Improve circulation, <br />Railroad Avenue improvements, PS&F, City of Santa Clarita, CA. Project manager for design and right- <br />of-way services for Improvements to Railroad Avenue. The project Included the realignment of Railroad <br />Avenue, pavement reconstruction, drainage Improvements, the Installation of new traffic signals/street <br />lighting, landscaping and right-of-way acquisition, <br />Via Princesse Extension, project Study Report Equivalent (PSRE), City of Santa Clarita, CA. Project <br />managiar responsible for the preparation of a PSRE for a 3.Q-mile extension of the Via PrIncessa <br />between Clalbourne Lane and Rainbow Glen Drive. This new arterial roadway Is a critical link In the <br />City's transportation network. The PSRE was prepared In response to LA Metro's Coll for Projects and <br />Included alternative alignment studies, cost estimates, environmental analysis and traffic studies, <br />RESUMES - APPENDIX Page 4 <br />ANDERSON-PENNA <br />25E-400 <br />