|
PAUL M. FRISLIE, PEI, IMSA
<br />Senior Engineer
<br />EDUCATION
<br />* Man, University of stromi 2011
<br />* as, civil crighmerag, University of
<br />Callmmla� firville, 2008
<br />REGISTRNUIONS
<br />Civil Engineer (PE);
<br />CA472992,2008
<br />Association RMSA):
<br />rieffICS19cal LovelH, 481197189,
<br />2012
<br />TrafficSignal Level 1, 0AA97109,
<br />2012
<br />Signal [refractor Level[,
<br />JIS197189,2014
<br />Work Zone Safety, RZN7189.
<br />2010
<br />YEARS OF EXPERIENCE 17
<br />CORE (OMPETENCIES
<br />• Traffic
<br />• ITS Planning, Do.sIgn & Ifeelpation
<br />• Traffic Signal Design
<br />ComanntflollAssistance
<br />Transit
<br />ArFILIA1 IONS
<br />Ciouge County Traffic lingmep, ing
<br />Council (CCTEC)
<br />i .1i —
<br />terist
<br />Mr. Fielie seems as a Senior ErL4nL,6ronteris�-ransportatiolI SVsL,,s die5lon and
<br />leas been nifth firrushnne Imearl, 2001, For over 17 years, Mr, rnble has; been
<br />involvedin several transportation and traffic engineering projects ulat include Linda
<br />plarellogas well as design and deployment of in systems mogratc,c ;ad traffic
<br />signal design. Recently, he has senvesclasthe Project Manarterfor the Immortals
<br />A'anualoteral Improvement PmjKt, Cypress Phase I thrmeii, 3 ITS Projects, tire
<br />Newport Beach ITS Phase 5 thrOulth 8 Prolects, the Santa Moirm ATIVIS Phxg. 4,
<br />I'MIKI. NMPOrt Beach ITS Phase L 2, 3k 4 and 7 Projects and the Fountain Valli
<br />Phase IV pettiest. as well as tile Signal Construction Inspector for completion of t
<br />Oxnard ITS Master Plan and the Rmecians and Vermont Arterial Improvements,
<br />Project Experience
<br />Harbor Boulevard Treffic Signal Synchronization (rSS) project - Orange
<br />County Transportation Authority (OCTA) and City of Sant a Ann, CA
<br />Mr. Frislie served as QA/QC lead and Con spection Manager to provide
<br />construction support and perform all necessary Integration,
<br />lancitureentatten, and fine-tening tasks for tile Harbor Blvd TSS project.
<br />This project Involved signal synchroulzat Ion and WRAPment upgrade along
<br />Harbor Blvd from Chareman Ave to Newport Blvd, Spooning Across the
<br />Cities of Garden Grove, Santa Ana, rountain Valley and Costa Mesa, as
<br />well 81 freeway OO/Off ramps At SR-22 and t-405 within Caltrams
<br />jui isafiction. In addition to generating PS&E packages for equipment
<br />upgrades, the project also included the development, Implementation
<br />and fine4uning of the AM, Phil, midday, off-peak and weekend traffic
<br />signal coordination timing plans for all 46 Intersections along the corridor.
<br />It ' stris will also provide Traffic Management Center (TMQ upgrades to the
<br />cities Of Costa Mesa and Santa Ana, which spans from closed-Ch cuff
<br />Television (i lklnllse� and workstations to designing and replacing the
<br />City's existing video wall system with newerand more advanced
<br />intraleffifies.
<br />60tranca Plevy/Mublands Blvd Regional Traffic Signal Synchronization
<br />Project - Cities of Irvine, Lake forest Lik A-RISSIDn Vf0j), CA
<br />lvlf� FrKlie is tile QA/QC Leader to provide traffic/iTS design Improvements
<br />and traffic signal synchronization for 44 intersections along a 13, mile
<br />segment of Barranca ParLwatersduirlands Blvd. The project Involves design
<br />of new fiber optic cables (at ohl and single made), conduits, au It boxes�
<br />cabinets and controlliter upgrade in City of hvina, New conduits, poll Boxes,
<br />twisted pair Interconnect, And wireless radio in City of Lake Forest; New
<br />cabinets, pedestria, n signals and loop detect [on In City of Mission Viejo, In
<br />Addition to the traffk,. signal Infrastructure improvements, gods also
<br />develop$ signal coordination plans for AM, noon, ojf�pelk, PM, 'a Her.
<br />hours" anti weekend for all project traffic signals a long the corridor,
<br />NeWport/Baltiria Boulevard Regional Traffic Signal Synchronization
<br />Project - Of 10, 5 of Costa Mesa arid Newport Beach, CA
<br />Mr. FrIslia serves as the QA/QC leader and E ngineer of Re. cord to CICTA to
<br />provide turn -key traffic/ITS Improvements and traffic Signal synchronization
<br />for 33 Intersections along Newport/BalbDa floulo.vard corridor from Brist of
<br />Street in Costa Mesa to Main Street in Newport Reach,
<br />Innovating Through Irif ormatics'm
<br />25E-472
<br />
|