Laserfiche WebLink
boll6wrila Professional Geologist <br />(N6.9W) <br />Certified California Hydrogeologist, <br />(NO. 1038) <br />GEOSCIENCE TERRY A. WATKIN% JR. PG, C <br />`177� Senior Goohydr*119ght <br />Mr. Watki0s, has over fourteen Years of experience In many different typet ot <br />lhvestlllliatlons� ground water quality irtpiii.es� <br />artificial recharge projods, water wall test drilling prograinsi sea water <br />000111`14116111 programs, afidthe Management and supervision of water well <br />Projects filculdIfig; siting, 41054h, Ouftl` pumping tog analyses and well <br />construction. Ostlad 130110WArls various 69hrOpIsts of Me. Watkine experience: <br />2016 <br />Developed rehabilit ' atlon r0torittrieridatl9m; and Work plan for contractor <br />activities. Served as project 100 construction rminit$a? during rehabilitation, <br />redevelopment, and testing of the well� This <br />ptoduction capability of this well. <br />City of Huntington Beach — Replacement ofWefil No. A <br />2014 to Present <br />Prepared prelifillfiary design documents and drawings as well astechniChi <br />plans and.specifteAtIorls for the drilling, construction, developrefent, and <br />testing of the City of Huntington Beach Replacement Well No. 1. Will provide <br />Construction minlageOletit servIteshicluOingwell design recommendations, <br />during construction activities which should begin second cuarter of 2017. <br />West VallOY Water District — Rialto Colton Monitoring Well No. 1. <br />2615 to 2016 <br />Project manager for the drilling, desfgn� construction, and development of a <br />910 it stainless steel mon4orltig well to serve as a sentinel well monitoring <br />perchlorate migration, <br />PiCQ Walter District. 2016 to Present <br />Project manager overseeing all aspects of tills project, Tasks completed to <br />date Include well siting assessment and recommendation, drafting of technical <br />plans and specifications, contractor bid assistance, and permitting with <br />regulatory agencies. Construction and testing are scheduled to begin in <br />March, 2017 <br />25E-483 <br />