My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />Rate Schedule <br />Effective January 1, 2018 through December 81, 2018. If contract assignment enoends <br />beyond that date, a new rate schedule will be added to the contract, <br />N <br />ENGINEERINO SERVICES <br />HOURLY RATE <br />poncipal <br />$185 <br />Preject Manager <br />$160 <br />Quality Assurance Manager <br />$150 <br />senior Engineer <br />$135 <br />Prqgct Engineer <br />$130 <br />Tmft Engineer <br />$125 <br />Associate Engineor <br />$115 <br />Assistant Engineer <br />EngneadagIrcelmlolan <br />$90 <br />Designer <br />$3,10 <br />CADD Drafter <br />$86 <br />Administration <br />$75 <br />MUNICIPAL SERVICES <br />HOURLYRATE <br />Principal <br />$230 <br />Pmject Executive <br />$195 <br />Program/Projed Director <br />$175 <br />Asslarard Project Manager <br />$136 <br />CftyCrdnear <br />$135 <br />Plan Check Engineer <br />$120 <br />Planner <br />$100 <br />Public Works Technician <br />$90 <br />Permit Technician <br />$65 <br />CONSTRUCTION SERVICES <br />HOURLY RAtE <br />Senior Construction Manager <br />$165 <br />Construction Manager <br />$145 <br />Project Managgr <br />$135 <br />Resident Engineer <br />$140 <br />011ce Engneer <br />$120 <br />Project Controls EngInser <br />$100 <br />Labor Compflance/Documents Control <br />Vs <br />Construction Observer (Non Prevailing Wage) <br />$98 <br />Construction Observer (Prevailing Wage) <br />$118 <br />Building inspector (Non Prevailing Wage) <br />$85 <br />Surveying (Zoerson survey crew) <br />$260* <br />REIMBURSABLE EXPENSES <br />COST <br />Reproduction <br />cost <br />Consultant Services <br />cost + 15% <br />Automobile Transportation <br />$,54 per mile <br />Delivery, Freight, Courier <br />cost <br />Agency Fees _ <br />Cost <br />Commercial Travel <br />cost <br />*Assumes prevailing wag" are applicable for field work. <br />25E-488 <br />
The URL can be used to link to this page
Your browser does not support the video tag.