Laserfiche WebLink
March 20, 2018 <br />City of Santa Ana <br />Public Works Department <br />Attn: Armando Famandar, Project Manager NIV15 <br />20 CIVIO Center PiazD <br />Santa Ana, CA 92701 <br />SUBJECT. Proposal for On -Call Engineering Services, RFP No. 17-083 (Option A and 8) <br />Dear Mr.,Famandaz, <br />At NV5, weooknowledge that design engineering Projects are vital to the community, and we have morathan 10 years of <br />6461100100 Pathlefing with many cities: and agencies across Southern California to Provide on -Doll services on 13110160tS Of similar <br />scope. We tire excited to have the opportunity to VW106thOsssetvieft to the City Of Santa Ana (City), We have prpparaothis <br />Proposal to demonstrate how our team is be% suited to deltvier the requested services and offer the following: <br />R610VOrd 9XI)OVIefloo. At NV6 we believe that Past experience And success are a key Indicator of future performance. We are <br />committed to providing hIgh-quality saryloor and believe thatcommitinea Is oner mason why over 9096 of our work corre$ ftm <br />repeat clients — an obvious indicator of ollerntsatiolaction. We hove, Included references, as requested, op well a relevant r <br />project experience to demonstrate out success in furfillings1miler efforts and encourage the City to contact our referencesto <br />cOdfm ourW00eserful traok record. <br />Personnel: NV5 offers the City a hIghiycompot6nt tearn with an unParal leled reputation and proven capability and expertl$e. We <br />have chosen Project Manager Charlie 110111004 PE to lead the Wavy Itesearces, (option A) Projects, Mr McKkkIDY has more <br />then 30 years of experience In water and wastewater design engineering for both jorg"osle capital Improvement projects and <br />small InfrostroaturO improvement projects. Ke has a broad range of project experience with a focus on Pipellnesi pump stations, <br />reservoirs, ondl treatment, <br />Understanding both the project requiverdentgand scoPeof work requested bythe City, we havesolootedl Poqo" Me be <br />Niloude, PE as your team leader hog" vid <br />for,prolem under Oenead Engineering other then Water RaROW0 (Option 6). Mr. N[krafs <br />has both managed and directed similar projects throughout Southern California add has Mote then 30y0arsotiolvildealgin <br />engineering experience with a fbouson street Improvements, Including re.hablikation, recoostruallon, Interse I <br />at on widening and <br />parkway improvements, He is supported by a team of highlyednocred engineers and designers as well as our carefully chosen <br />subconsuftents, most of which have been working with us for the Past eight years. Should the need arise; out entire staff of <br />dedicated Professionals could be Made available to be of servins to the City. <br />Resources: We are. enluipped with the personnel and resources racim ired to meet the, Ofty's schedule for any projects we <br />undertake, a nd we have never missed a pMeot deadline. We Oro financially viable, and there are no conditions that may <br />Impede our ability to complete the City's orojeota. As a part of NV5, Inc., an Internationa I oortipany with the local Persons [fly and <br />presence to quickiy and creatively address your engineering, design, and stuff sugmentatow needs, we have the ability to assist <br />our clients In. an exps nded role with access to more than 2,000 Professionals from 100 lociltions, All services will be provided <br />from our offices In Irvine, located less then IS miles frolwthe city. <br />Quality and Cost Control: We have a Proven work plan to complete PrOlarts on time, within budget, and with minimal Impact to <br />the surrounding businesses end residents. Our quality, cast, and schedule control measures will result In timely and successful <br />completion of the ClV$ projects. This successful track record provides the basis for our quick and reasonalbly priced project <br />delivery, <br />Amy Arnharil, PE, Vice President of NV5 has the authorityto contractually bind tho team and may be contacted during the <br />proposal evaluation process, <br />We look forward to the opportunity W work with the City and help you achieve your goals and objectives. If you need further <br />Information, I may be reached by Phone at (949) 05-0477, or electronically at amy.amIrani@nv5,Gom, Thankyou for your time <br />and consideration, <br />Sincerely, <br />NV5 <br />OAKf 4%4� CONTRACT AGREEMENT STATEMENT <br />NVS concurs with all provisions as <br />contained In the sample agreement as <br />Amy Amlranl, PE David Nikniefs, PF Included In the RFP, <br />Principal -la -Charge / Vice ProWdent Director of Operations <br />1�800 Irvine Center Drive I lrvIne,CA926:LS I wwwNVS.00m I Office:949,665.0477 I F=949.685,0433 <br />25E-499 <br />