Laserfiche WebLink
CONTACTINFO <br />TOM ACUNAr AICP <br />1 85,0477 <br />Environmental Manager <br />............. . . ........ ....... ... ... ................. <br />EXPERIENCE <br />. .................... . . ...... <br />Mr. Aouna currently diracts the eftas-of HV51� Environmental Group, performintall <br />�5 years <br />0400% or environmental support, He has mote than 86 yosrapf experience obt4ining <br />EDWATION <br />local, sta% and federal approvals for electric a nd gas projects. Dudes Include supervising <br />UA, Sustness <br />eight Field Environmental Specialists aPect4lizing 10 biological and environmental <br />AdminIstratlon <br />permitting. News$ t0sponalble for phaorIng taguistory strategies W obtain permits, <br />reviewing and editing technical FSPOr%pWaring environmental relesses. coordination of <br />Associates AM Degree <br />construction monitoring, tracking and 08914hIng projects, and program administration of <br />UCENSER15, <br />state and federal Permits, clearing the way for $00.operations in Calfiernias Central valley <br />American Institute of <br />and desert ragions. <br />C a <br />Corti" d Planners '.'a. <br />016829 <br />Project EXperlence <br />Hazardous Materials <br />.... -.1 .... .... .... ...... ........... . ...... ...... 11 .......... ........... . . ............... <br />& Site Assessment <br />Dortificartion, University <br />. .. <br />Escondido E(pedited.8attery 30 M 12OMWH and El Cajon I SDO&E <br />. . W/ <br />of California San Dlego <br />Tornwas responsible for ensuring environmental and SOMY compll$rft for two large <br />lith[UITIIOn.Oa.#Ofygorag6sy$WMs This technology Is relatively new to Iniv.0-sto ties <br />r poll <br />and required comprehensive review Of manufacture specifications and operational <br />Certified Environmental <br />faquiromonts to minimize-809&E,risk, <br />surveyor SPUE -'19P4 <br />ECO Substation PTO Application I Sr)G&.E <br />Prepared the Eco Substation Proponent Environ mental Assessment and oversaw <br />the Joint EIR/EIS. This 009WI)Ont described and evaluated proposed ifinprovernarrie <br />consisting of a now i00-acrd substation/8witchyard, expansion to an 04s.Ung <br />substation, and construction of a 13-mile transmission line to connect thern. The PTO <br />granted the application in juns, �012, <br />Mountain Ernpirs Major Use Permit I County of Son Diego <br />Tom worked with this team -obtain Major QS6 Perrrflt from the County of San Diego <br />to allow a heavy equipment training facility, Key OEQA Issue$ were visual and noise <br />lmpacls� At this direction, Tom conducted a OEQA;Inittal study and employed measures <br />so that the project qualified for a Mitigated Negative Doofaratiom Project completed In <br />2011, <br />Hazardous Material Assessment I City of Coachella <br />Tom developed and provided a hazardous material assessment (phase 1) related to <br />the removal of water line 49 from a street position and private prop", The Phase I <br />Identified historical contamination and Its relationship to hazardous material related to <br />the water line. Completed June 20.17, <br />90 <br />San. Die Natural Gas Pipeline CFCN Application I SQG&E <br />Supported the project during the routing phase of a new 42-mile gas line. Provided <br />N I V opportunklas end constraint mapping, IderntlIed feasl1loalternatIves, Identified <br />regulatory requirements at multiple looptions, and oversaw off" of environmental <br />team In 20:1.6 to prepare a project Proponents Environmental Assassmera.'The COON <br />application Is currently under consideration at CPUG). <br />25E-538 <br />