My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FY 2018-19 PROPOSED MISCELLANEOUS FEES SCHEDULE_75A-1
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
PROPOSED CITY BUDGET FY 2018-2019
>
FY 2018-19 PROPOSED MISCELLANEOUS FEES SCHEDULE_75A-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 7:41:34 AM
Creation date
6/26/2018 1:58:37 PM
Metadata
Fields
Template:
City Clerk
Agency
Finance & Management Services
Item #
75A-1
Date
6/19/2018
Notes
FY 2018-19 PROPOSED MISCELLANEOUS FEES SCHEDULED
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION <br />2018 -XXX <br />3.88% <br />PROPOSED <br />REVENUE <br />FY 17-18 <br />FY 18-19 <br />ACCOUNT <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE <br />UNIT <br />FEES <br />FEES <br />SECTION IX <br />PLANNING& BUILDING AGENCY <br />New or Total Rewire for Single Family Dwellings: <br />51603 <br />199) <br />SFD(per square foot) <br />sq. ft. <br />0.14 <br />0.14 <br />51603 <br />200) <br />Garage (per square foot) <br />sq. ft. <br />0.14 <br />0.14 <br />51603 <br />201) <br />Temporary Electrical Service, Prior to approval or <br />Each Meter <br />234.98 <br />244.09 <br />Occupancy (30 Days) <br />At the time of application for temporary power, the owner <br />shall post a $1,000 cash or cashier's check conforming to the <br />Santa Ana Municipal Code Section 8-1768 for each service <br />meter. This deposit shall be released upon request after the <br />Certificate of Completion or Certificate of Occupancy is Issued. <br />Mechanical Fees <br />51604 <br />202) <br />Permit Issuance Fee <br />52.98 <br />55.04 <br />51604 <br />203) <br />Minimum Fee (Nonresidential) <br />70.64 <br />73.38 <br />53603 <br />204) <br />Stand Alone Mechanical Plan Check <br />65% of Subtotal <br />65% of Subtotal <br />Furnace including ducts & vents (each) <br />51604 <br />205) <br />Up to 100,000 BTU <br />63.14 <br />65.59 <br />51604 <br />206) <br />Over 100,000 BTU <br />90.08 <br />93.58 <br />51604 <br />207) <br />Furnace/Com pressor Combo (Residential) <br />122.16 <br />126.90 <br />Each Compressor, Boiler or Heat Pump (packaged or split system) <br />51604 <br />208) <br />Up to 5 HP <br />86.82 <br />90.19 <br />51604 <br />209) <br />Over 5 to 30 HP <br />103.82 <br />107.85 <br />51604 <br />210) <br />Over 30 to 50 HP <br />129.79 <br />134.82 <br />51604 <br />211) <br />Over 50 HP <br />139.86 <br />145.28 <br />51604 <br />212) <br />VAV Box up to 2,000 CFM <br />42.85 <br />44.51 <br />51604 <br />213) <br />VAV Box Over 2,000 CFM <br />63.12 <br />65.57 <br />51604 <br />214) <br />Air Handling Unit Up to 2,000 CFM <br />42.85 <br />44.51 <br />51604 <br />215) <br />Air Handling Unit Over 2,000 CFM <br />63.12 <br />65.57 <br />41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.