My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MICHELS PIPELINE CONSTRUCTION
Clerk
>
Contracts / Agreements
>
PROJECTS
>
MICHELS PIPELINE CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2018 9:20:56 AM
Creation date
6/27/2018 12:07:09 PM
Metadata
Fields
Template:
Contracts
Company Name
MICHELS PIPELINE CONSTRUCTION
Contract #
15-6447
Agency
Public Works
Council Approval Date
3/6/2018
Document Relationships
20A - AA WATER MAIN IMPROV
(Attachment)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2018\03/06/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 15-6447 <br />WEST GROVE VALLEY NEIGHBORHOOD WATER MAIN IMPROVEMENTS <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />14* <br />Repair Sidewalk per City Standard <br />2,000 <br />SF <br />$ <br />Drawing 1104 <br />1 <br />�( <br />15* <br />Imported Backfill Material <br />500 <br />CY <br />$ <br />�s <br />$ <br />Int SGC <br />16* <br />1" Combination Air Valve Assembly per <br />City Standard Drawing 1415 <br />6 <br />EA <br />$ <br />$ <br />t17* <br />Slurry Seal Entire Street Width along <br />Pipeline Alignment with REAS Type II <br />220 <br />TN <br />$��� <br />$ <br />Ca <br />18 <br />Bollards & Appurtenances <br />2 <br />EA <br />$1,000 <br />$2,000 <br />TOTAL BASE BID (It(ms <br />U, 3$r C>gro-0C) <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />T This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within one -hundred and thirty five (135) workin14 days after the commencement <br />date stated in the Notice to Proceed. <br />• 15 — Working days for exploratory potholing and data gathering <br />• 120 — Working days for project construction <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the <br />Standard Specifications, shall be $2,000 per calendar day. <br />Name of Firm Michels Pipeline Construction, a division of Michels Corporation <br />Signature of BIDDER �� c/ V Kyle Melcher <br />Title <br />(If an individual, so state. If a firm or co -partnership, state the firm name <br />the names of <br />all individual co-partners composing the firm. If a corporation, state legal name of corporation, <br />and names of President, Secretary, Treasurer and Manager, thereof.) <br />P-2 of P-16 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.