Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 15.6447 Exhibit A <br />WEST GROVE VALLEY NEIGHBORHOOD WATER MAIN IMPROVEMENTS <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Michels Pipeline Construction a division of Michels Cogyoration <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />flunish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sums) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Price <br />Amount <br />1 <br />Mobilization andDemobilization(not to Exceed 5% of Total Contract) <br />EUnItUnit <br />$4060 <br />$?0'000 <br />2 <br />6" PVC C-900 (Class 235) Waterline per <br />Standard Drawing 11503 <br />$ I �6 <br />$ �City <br />8" PVC C-900 (Class 235) Waterline per <br />City Standard Drawing 1150] <br />9,8 <br />I <br />4 <br />8" Gate Valve per City Standard Drawing <br />1410 and Anchor Block <br />19 <br />EA <br />$'�r100 <br />$r, 3e7'D <br />5 <br />1"Domestic Service andMeter Box per <br />City Standard Drawing 1401 <br />242 <br />EA <br />$� 15 "11 <br />v <br />6 <br />Fire Hydrant per City Standard Drawing <br />1405 and Detail 3 on Sheet WD -OI <br />13 <br />EA <br />$ I <br />Oo <br />7 <br />2"Blow Off Assombly and Thrust Block <br />per City Standard Drawing 1414 <br />6 <br />EA <br />8* <br />8" Vertical offset (type 2) per City <br />Standard Drawing 1413B <br />2 <br />EA <br />$ <br />GI' 500(1 <br />$ <br />q, 400 <br />9 <br />Install Cut -fn Tee on Existing PiPe Por <br />Details on Platys <br />2 <br />EA <br />3 000 <br />6,000 <br />10 <br />PCC Cross Gutter Replacement <br />14 <br />.EA <br />$ <br />$ /j, 600 <br />11 <br />Pro/Post CCTV for Sewer Main and Sewer <br />Lateral <br />1 <br />LS <br />$' <br />$ <br />12* <br />Additional Trenching Costs to Install <br />Water Pipeline 18"-30" Deeper <br />120 <br />LP <br />$ <br />$ <br />(Total 54" <br />to 66' cover) <br />13* <br />Additional Potholing <br />10 <br />EA <br />$ <br />I, X60 <br />$ <br />13,aoa <br />P-1 of P-16 <br />