My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL AMERICAN ASPHALT (17)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ALL AMERICAN ASPHALT (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2018 9:51:04 AM
Creation date
6/28/2018 9:49:14 AM
Metadata
Fields
Template:
Contracts
Company Name
ALL AMERICAN ASPHALT
Contract #
Various
Agency
Public Works
Council Approval Date
5/15/2018
Document Relationships
23A - FLOWER ST IMPROVEMENTS
(Attachment)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2018\05/15/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA ADDENDUM No, One <br />PROPOSAL <br />PROJECT NO.: 18-6916 <br />FLOWER ST. SLURRY; SUNFLOWER AVE. TO MACARTHUR BLVD. <br />PROJECT NO,: 18-6917 <br />MACARTHUR BLVD, SLURRY; RAITT ST. TO BRISTOL ST. <br />TOTAL BASE BID <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add-altertrate bid items (if any). <br />t This bid item is considered a Specialty Item per Seetion 2-3.2 of the Standard Specifications. <br />TIME EOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within f2rty-five (45) working days after the commencement date stated in the <br />Notice to Proceed. All work must be completed by August 31, 2018, <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the <br />Standard Specifications, shall be $2,500 per calendar day. <br />Nae of Firm All American Asphalt <br />Signature of BIDDER <br />Title <br />(If an individual, so state, If a firm or co -partnership, state the firm mama and give the names of <br />all individual co-partners composing the firm. If a corporation, state legal name of corporation, <br />and names of President, Secretary, Treasurer and Manager, thereof.) <br />All American Asphalt -Corporation <br />Mark Luer- President <br />Edward J. Carlson- Vice President <br />Michael Farkas- Secretary <br />P-3 of P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.