My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALL AMERICAN ASPHALT (17)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ALL AMERICAN ASPHALT (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2018 9:51:04 AM
Creation date
6/28/2018 9:49:14 AM
Metadata
Fields
Template:
Contracts
Company Name
ALL AMERICAN ASPHALT
Contract #
Various
Agency
Public Works
Council Approval Date
5/15/2018
Document Relationships
23A - FLOWER ST IMPROVEMENTS
(Attachment)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2018\05/15/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA ADDENDUM No. One <br />PROPOSAL <br />PROTECT NO.: 18-6916 <br />FLOWER ST, SLURRY: SUNFLOWER AVE. TO MACARTHUR BLVD, <br />PROJECT NO.: 18-6917 <br />MACARTHUR BLVD. SLURRY: RAITT ST, TO BRISTOL ST. <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />13 <br />Root Shave <br />1 <br />EA <br />$ I1UU.UO <br />$ IoUU,aU <br />14 <br />Adjust Metal Pull Box Frame and Cover to <br />Finish Grade <br />-& <br />2 <br />EA <br />$(050.0() <br />$ 300, 00 <br />15 <br />Adjust Manhole Frame Cover to Finish <br />Grade <br />10 <br />EA <br />$ % 51, U 0 <br />$ �SrU , U U <br />16 <br />Furnish and Install Water Valve Frame and <br />Cover to Finish Grade <br />8 <br />EA <br />$ Q O • <10 <br />$ 140 U • 00 <br />17 <br />Furnish and Install New #6 Full Box <br />4 <br />EA <br />$ tolo , 0 0 <br />$ ��((7C7 , UU <br />18 <br />Protection of Surface Utility Frames & Covers <br />(Flower St.) <br />1 <br />LS <br />$ 0 1 U 0 <br />q j <br />$ � 0. OU <br />J <br />19 <br />Protectlon of Surface Utility Frames & Covets <br />(MacArthur Blvd.) <br />1 <br />LS <br />$q,50,00 <br />$ Q SO -10 0 <br />20 <br />Temporary Construction Sign <br />3 <br />EA <br />$ IIOO.Oa <br />$ 3300 " 00 <br />21 <br />Project advertisement sign <br />4 <br />EA <br />$ 105o. v p <br />$ q.Z p 0. UO <br />22 <br />Finnish and TficLpeDj <br />28 <br />EA <br />$ -Z-2 <br />U 0 <br />$ (0 5,5Z, 0 0 <br />23 <br />Furnish and Install Traffic Loops Type E i <br />67 <br />EA <br />$. U8 •C) <br />2' <br />$ <br />24 <br />Signing and Striping (Flower St.) <br />1 <br />LS <br />$ gZ00,0 0 <br />$ �0 p' 00 <br />25 <br />Signing and Striping (MacArthur Blvd,) <br />1 <br />LS <br />$ 11 d p p, U U <br />26 <br />Labor Agreement Oversight <br />I <br />LS <br />$ 15,000 <br />$ 15,000 <br />P-2 of P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.