Laserfiche WebLink
COST ANALYSIS <br />CONSTRUCTION OF THE PROJECT NO. 16-6872: SAFE ROUTES TO SCHOOL <br />ENHANCEMENTS AT WASHINGTON ELEMENTARY <br />Approved by Council on December 6, 2016 <br />Construction Contract <br />$ <br />457,711.75 <br />Contract Administration <br />$ <br />28,398.00 <br />Inspection and Testing <br />$ <br />40,259.25 <br />40,259.25 <br />Contingencies <br />$ <br />Contingencies <br />$ <br />45,772.00 <br />146,000.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ <br />572,141.00 <br />Revised Cost Analysis <br />Construction Contract <br />$ <br />457,711.75 <br />Contract Administration <br />$ <br />28,398.00 <br />Inspection and Testing <br />$ <br />40,259.25 <br />Contingencies <br />$ <br />45,772.00 <br />Additional contingencies this Action <br />$ <br />146,000.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ <br />718,141.00 <br />EXHIBIT 2 <br />2301-5 <br />