My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WOOD ENVIRONMENT AND INFRASTRUCTURE SOLUTIONS, INC.
Clerk
>
Contracts / Agreements
>
W
>
WOOD ENVIRONMENT AND INFRASTRUCTURE SOLUTIONS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 8:17:18 AM
Creation date
7/5/2018 11:16:14 AM
Metadata
Fields
Template:
Contracts
Company Name
WOOD ENVIRONMENT AND INFRASTRUCTURE SOLUTIONS, INC.
Contract #
A-2018-143
Agency
PUBLIC WORKS
Council Approval Date
6/5/2018
Expiration Date
6/30/2021
Insurance Exp Date
7/1/2021
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />Commercial/Industrial Inspection and Database <br />Management Consultant Services <br />projects include design, implementation, and reporting for Bacteria TMDL compliance monitoring in five <br />watersheds, and she assisted in the development of Watershed Management Plans for six major watersheds <br />in San Diego County. <br />Education: B.A., Environmental Studies., University of San Diego, 2003 <br />Registrations: Certified Professional Storm Water Quality, Reg. No. 724 <br />Percentage of time devoted to project: As Needed <br />Morvarid Azizian, PhD, E1T — Special Inspections and Studies <br />Ms. Azizian was recently hired by Wood. She has her Ph.D in chemical engineering with an emphasis on <br />Environmental Engineering and Water Quality. Her professional experience includes postdoctoral research <br />at University of California, Irvine and was a visiting scientist at Southern California Coastal Water Research <br />Project (SCCWRP). Ms. Azizian will assist with TMDL support and special studies. <br />Education: PhD., Chemical Engineering, University of California, Irvine, 2017; M.Sc., Chemical Engineering, <br />University of Tehran, Iran, 2011; B.Sc., Chemical Engineering, Azad University, Tehran, Iran, 2009 <br />Registrations: EIT, No. 160948 <br />Percentage of time devoted to project: As Needed <br />As demonstrated above, our project team has more than sufficient resources to meet the City inspection <br />requirements due to the number of trained NPDES compliance inspectors and additional staff that may be <br />required to assist the City on request. This is demonstrated further in our schedule provided in Section 6.4. <br />3.0 Understanding of Need <br />Wood has included an outline which demonstrates the firm's understanding of the work. The outline <br />includes the anticipated approach, tasks necessary for successful completion, and deliverables. These tasks <br />are described further below as well as in the Scope of Services and Schedule. Suggestions or special <br />concerns the City should be made aware of is also included below. <br />3.1 Outline of Tasks <br />1. Project kick-off and safety/annual training specific to City inspection program (Subtask 1) <br />2. Inventory update (Subtask 1) <br />3. Update announcement letters (Subtask 2) <br />4. Send announcement letters (Subtask 2) <br />5. Inspections and population of database records using web -based application (Subtask 2) <br />6. Issuance of enforcement as needed (Subtask 2) <br />7. Senior review of forms (Subtask 2) <br />8. Mail completed inspections forms (Subtask 2) <br />9. Prepare and submit draft quarterly report deliverable (Subtask 1) <br />10. Prepare and submit final quarterly report to the City via email (Subtask 1) <br />11. Perform quarterly inventory update (Subtask 1) <br />12. Prepare Chapter 9 PEA Excel Tables and Microsoft Word Report (Subtask 1) <br />13. Perform additional program assistance as needed (Subtask 3) <br />Proposal No. 18PROPGOVT.01301 March 2018 Paqe 9 of 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.