My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROPOSED BUDGET
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
07/03/2018
>
PROPOSED CITY BUDGET FY 2018-2019
>
PROPOSED BUDGET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2018 1:57:11 PM
Creation date
7/6/2018 1:37:56 PM
Metadata
Fields
Template:
City Clerk
Agency
Finance & Management Services
Date
7/3/2018
Notes
CITY BUDGET
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL REVENUE FUND <br />PUBLIC WORKS AGENCY PROGRAM <br />Traffic Signal Maintenance & Engineering 02917620 <br />S�atGerr�ent pfimPurpose .. . <br />Facilitate the operation and maintenance of the advanced traffic management ,system (A TNIS), including the <br />citysavide tra e signal and communicationn networks, the Santa .4nei Trak Management Center, and the <br />traffic information ,system. <br />X1ceo'npl�shrrentstm;�Y201� 1B...,.; <br />* Maintain and operate the City's ATMS, including citywide traffic signal cominunication network. <br />* Complete Design of traffic signal synchronization project on 17th Street/Westminster Avenue. <br />• Complete Design to Upgrade 8 traffic signal cabinets <br />* Complete Design to Upgrade all non-standard traffic signal vehicle heads to current standards <br />* Complete Cooperative Agreement with City of Costa. Mesa for Implementation of Synchronization on Fairview St <br />and Bear St <br />Actlon Plan fOrFYOtB t9 <br />* Maintain and operate the City's AIMS, including citywide traffic signal communication network. <br />Complete Implementation of new traffic signal Synchronization timing for 17th/Westminster <br />* Operate and Maintain new optimized traffic signal Synchronization timing for Grand Ave, Bristol St, and Harbor Blvd <br />* Complete Design of traffic signal improvements and Synchronization tinging for Fairview St and Bear St <br />Aotuacl <br />Actual <br />Estfmatd <br />'0Ott <br />PERFORMANCE MEASURES <br />�5 16 <br />9 0 17 <br />FY I7 18 ,; <br />.FY, t 0 19 <br />Service Level <br /># of traffic signals operated and maintained <br />298 <br />299 <br />302 <br />303 <br /># of traffic signals in city maintained by others <br />32 <br />32 <br />32 <br />32 <br /># of CCTV cameras operated and maintained <br />92 <br />95 <br />98 <br />105 <br /># of emergency vehicle preemptions maintained <br />155 <br />157 <br />160 <br />163 <br /># of activated flashing crosswalks/beacon <br />16 <br />10 <br />14 <br />28 <br />maintained <br /># of street name signs replaced <br />0 <br />10 <br />10 <br />10 <br /># of variable speed signs maintained <br />7 <br />9 <br />9 <br />9 <br />Efficiency <br />Average annual maintenance cost in dollars <br />per traffic signal (including energy cost) <br />2,724 <br />3,026 <br />2,960 <br />3,549 <br />5-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.