Laserfiche WebLink
CAPITAL FUNDS <br />PROJECTS FY 18-19 <br />22217660 LOCAL DRAINAGE AREA 11 <br />STREET IMPROVEMENTS <br />Street/Bridge Improvements & Widening <br />Bristol Street improvements and Widening: Phase 3B - Washington to 17th 388,000 <br />22317660 LOCAL DRAINAGE AREA III <br />UTILITYIDRAINAGE/LIGHTING IMPROVEMENTS <br />Storm Drain/Water Quality <br />D-03 Channel Improvements at Alton Avenue 100,000 <br />TOTAL LOCAL DRAINAGE AREA FEES PROJECTS 488,000 <br />7-19 <br />ACTUAL <br />ACTUAL <br />PROJECTED <br />PROPOSED <br />FY 15-16 <br />FY 16-17 <br />FY 17-18 <br />FY 18-19 <br />22317660 LOCAL DRAINAGE AREA III <br />66220 Irnprovernents Other than Buildings <br />0 <br />11,408 <br />37,704 <br />100,000 <br />22417660 LOCAL DRAINAGE AREA IV <br />66220 Improvements Other than Buildings <br />7,585 <br />0 <br />0 <br />0 <br />22517660 LOCAL DRAINAGE AREA V <br />66220 briprovernents Other than Buildings <br />1,505 <br />0 <br />80,000 <br />0 <br />22617660 LOCAL DRAINAGE AREA VI <br />66220 bnprovements Other than Buildings <br />601 <br />0 <br />0 <br />0 <br />TOTAL LOCAL DRAINAGE AREA EXPENDITURES <br />31,431 <br />104,980 <br />390,375 <br />488,000 <br />PROJECTS FY 18-19 <br />22217660 LOCAL DRAINAGE AREA 11 <br />STREET IMPROVEMENTS <br />Street/Bridge Improvements & Widening <br />Bristol Street improvements and Widening: Phase 3B - Washington to 17th 388,000 <br />22317660 LOCAL DRAINAGE AREA III <br />UTILITYIDRAINAGE/LIGHTING IMPROVEMENTS <br />Storm Drain/Water Quality <br />D-03 Channel Improvements at Alton Avenue 100,000 <br />TOTAL LOCAL DRAINAGE AREA FEES PROJECTS 488,000 <br />7-19 <br />