Laserfiche WebLink
NO FEE DOCUMENT <br />Exempt per Government Code 0103 & &27383 <br />RECORDING REQUESTED BY AND <br />WHEN RECORDED MAIL TO: <br />Capital Programs <br />ORANGE COUNTY TRANSPORTATION <br />AUTHORITY <br />550 South Main Street <br />P.O. Box 14184 <br />The Above Space For Recorder's Use On] <br />Project Name: OC Streetcar Project <br />Address: Santa Ana, California <br />APN: 008-06747 <br />Project Parcel No.: OCS-004-02 <br />THIS TRANSACTION IS EXEMPT FROM CALIFORNIA DOCUMENTARY TRANSFER TAX <br />PURSUANT TO SECTION 11922 OF THE CALIFORNIA REVENUE AND TAXATION CODE. <br />TRACTION POWER SUBSTATION EASEMENT <br />FOR VALUABLE CONSIDERATION, receipt and sufficiency of which is hereby <br />acknowledged, the CITY OF SANTA ANA, a charter city and municipal corporation organized and <br />existing under the Constitution and laws of the State of California, ("Grantor") hereby grants to the <br />ORANGE COUNTY TRANSPORTATION AUTHORITY, A Public Entity ("Grantee"), an <br />exclusive traction power substation easement (TPSSE) for the purpose of constructing, <br />maintaining, repairing, and adjusting, as applicable, above ground and underground facilities, <br />and their appurtenant fixtures and equipment, including but not limited to utility and <br />communication facilities, as required, in, under and across that certain real property situated in <br />the City of Santa Ana, County of Orange, State of California, which is described in Exhibit "A" <br />and depicted on Exhibit `B", both of which are attached hereto and made a part hereof. <br />Rights and Limitations of Use and Occupancy of TPSSE: <br />• OCTA shall provide the owner(s) and occupant(s) of the property subject to this TPSSE a <br />minimum of thirty (30) -days written notice as to when the Construction Period will <br />commence. <br />• During the Construction Period, OCTA may place a temporary fence around the TPSSE <br />area. <br />• The emergency driveway/gated area in the NE area will not be accessible during the <br />Construction Period <br />• Access to the TPSSE area shall be from public right of way. <br />• Driveway access will be maintained at all times. <br />• The following improvements within the TPSSE area will be removed as needed by OCTA <br />to allow for construction activities. All improvements so removed shall be included in the <br />compensation paid by OCTA for this TPSSE. <br />o Pavement within limits of TPSSE <br />0 6 parking stalls (permanently) <br />• The following improvements within the TPSSE area will be protected in place: <br />o Adjacent retaining wall <br />o Adjacent fencing <br />1201539.1 20A-23 <br />