My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT STORMWATER LIFT STATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
07/17/2018
>
25B - AGMT STORMWATER LIFT STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2018 5:31:44 PM
Creation date
7/12/2018 5:27:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
7/17/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br />MPOSAL <br />CivicCenterStormwaterLi(tStationRenovadon Design58rvices r: <br />•...x <br />Relevant Project Experience <br />Michael Baker is a leader in the field of water resources engineering and provides a full range of <br />professional services from analysis, concept through design, and construction support services. <br />Michael Baker has proven experience in developing practical and cost-effective solutions to meet <br />water resources design challenges. Within the last five years we have completed design for <br />numerous projects which demonstrate the ability of our experienced Project Team to efficiently <br />and effectively support the City of Santa Ana on this contract. Our team's work on the Stormwater <br />Pumping Stations Preliminary Study performed for the City in 2016, In conjunction with <br />development of the City's Storm Drain Master Plan — Including the area of the subject site, brings <br />great insight and background for proposed project Improvements <br />A sampling of relevant projects includes the following: <br />.fYwtki��.:flCF'.Y"atm;'•a�v.:i=etYJyAd`dLr�;.::+r:•S%:a•",+��.;}.i::; S;iW.?�;tS3>7:Se.L-r: �'ykw'a#:c:.i;:.+1Ci^:a�i�1:5F•t,�-„iWfNFl•;;:g1.�:TlJ'ies:.,yylri:):.a.� <br />Stormwater Pumping Stations Preliminary Study I Santa Ana, CA <br />Client: City of Santa Ana, 20 Civic Center Plaza, Santa Ana, CA 92702-1988 <br />Reference: Mr. Sean Thomas, (714) 647-5655 <br />Year: 2016 <br />Team Members Involved: Marek Przywara (Electrical Engineer); Sal Shaikh (Structural Engineer) <br />Michael Baker provided engineering services for <br />evaluation of two stormwater pump stations located within <br />the Civic Center area. Each pump station experienced <br />leakage and flooding problems during the EI Nino season <br />of 2016. The study consisted of on-site Inspections and <br />visual assessments of the structure, electrical equipment, <br />mechanical equipment, and general conditions of each <br />facility. Alternatives and preliminary costs were developed <br />for both pump stations. The Santa Ana Boulevard Pump <br />Station is located adjacent to the retaining wall on the north <br />side of Santa Ana Boulevard; and pumps stormwater to a <br />nearby culvert in Santa Ana Boulevard. The Flower Street <br />Pump Station is located in the southwest comer of the <br />Civic Center parking lot, adjacent to the retaining wall at the intersection of Flower Street and <br />Sixth Street; and pumps stormwater a 16 -inch gravity pipe in Flower Street <br />Yi.'tifYN.da :i-1vL'-3Wi2i 3'hP..L':Riy+r'SS.ce,.n,.'w '.'4%Jlv!"� M.\::fs+:w. +, .t :we'Y.`<>'�Ma[xY."!•ii^'iE>.i S�i. li'i?�:.i:.-M W4 Afe`d4' h• aa:Sp%A <br />Santa Ana Storm Drain Master Plan I Santa Ana, CA <br />Client: City of Santa Ana, 20 Civic Center Plaza (M-30), Santa Ana, CA 92702-1988 <br />Reference: Ms. Mindy Ly, Senior Civil Engineer, (714) 647-5665, miv(csanta-ana.oro <br />Year: 2016 (Phase 1) Additional modeling is ongoing <br />Team Members Involved: Mujahid Chandoo (Engineer, Hydrology/ Hydraulic Analysis) <br />Michael Baker provided professional engineering services to update the city's storm drain master <br />plan. The city has an established drainage system with some segments over 50 years old and <br />other segments recently constructed. The last city-wide hydrology and hydraulic analysis of the <br />CSIM <br />INTCAR TONAL 11 <br />25B-33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.