Laserfiche WebLink
PROPOSAL <br />Civic CenterStormwoterLiftStationRenovadonDesign Services rT W. } <br />References <br />Mr. David Pelser <br />(former Director of Public Works for City <br />of Whittier, now with Meridian Service <br />Metropolitan Water District) <br />(562)298-8476 <br />DavidCa)mrmetro.oro <br />City of Whittier <br />13230 Penn Street <br />Whittier, CA 90602 <br />Project., Whittier Pumping Plant No. 2 <br />Replacement Project <br />Year. 2016 <br />2. Ms. Betsy Cooper, Senior Civil Engineer <br />(805)654-7848 <br />ecooDer(rDventurawater.net <br />City of San Buenaventura <br />501 Poli Street, Ventura, CA 93002 <br />Project., North Bank Lift Station <br />Upgrades <br />Year. 2018 <br />3. Mr. Bob Greenlaw, Public Works Director <br />(310)510-0220 <br />bareenlaw(dcitvofavalon com <br />City of Avalon <br />410 Avalon Canyon Road <br />Avalon, CA 90704 <br />Project., Avalon Catherine Booster <br />Station and Pebbly Beach Lift Station <br />CIP Projects <br />References for Project Manager <br />Safa Kamangar <br />1. Mr. Danielle Mueller, Utilities Manager <br />(562)904-7110 <br />DMueller@downevca.oro <br />City of Downey <br />11111 Brookshire Avenue <br />Downey, CA 90241 <br />Project Blandwood Rdrrrue Ave Lift <br />Station <br />Year, 2016 <br />2. Mr. Chino Consunji, Director of Public <br />Works <br />(626)939-8416 <br />CConsunii(awestcovina.oro <br />City of West Covina <br />1444 W Garvey Ave S, <br />West Covina, CA 91790 <br />Project., Azusa Sewer Lift Station <br />Year., 2017 <br />3. Rodney Woods, Director of Engineering <br />(949)831-2500 <br />RWoods(2mnwd.com <br />Moulton Niguel Water District <br />27500 La Paz Road <br />Laguna Niguel, CA 92677 <br />Project., Paseo DeValencia Lift Station <br />Year. 2017 <br />INYIAIAT104/L 18 <br />25B-40 <br />