PROPOSAL
<br />Civic Center 5tormwoterLi(t5totionRenovation Designs
<br />ervices
<br />Marek Przywara, P.E.
<br />Lead Electrical Engineer
<br />y
<br />Mr. Przywara has served as a project manager and/or s
<br />electrical/controls engineer on the numerous water/wastewater gg
<br />facilities Including wastewater treatment plants, pump stations, f
<br />Years of Experience: 34
<br />sewer stations, reservoirs, solid waste facilities, desalt plants,
<br />etc. Duties included overall responsibility for engineering,
<br />EducatloNTreining:
<br />M.S., 1974, Electrical
<br />project management, development and design implementation,
<br />Engineering, AGH University
<br />supervision and approval of documentation and drawings,
<br />of Science & Technology
<br />calculations and analysis, schedules, specifications, cost
<br />B.S., 1972, Electrical
<br />estimates, and coordination with vendors and clients. Mr.
<br />Engineering, AGH University
<br />of Science &Technology
<br />Przywara has provided electrical and controls engineering and
<br />project management services for water and wastewater districts, ;
<br />Licenses/Certifications:
<br />municipalities, and utilities. °
<br />Professional Engineer-
<br />Electrical, California, 1994, a
<br />Project Experience
<br />14537
<br />Civic Center Stormwater Lift Stations — Preliminary Study,
<br />ProfessionalEngineer -n,
<br />ro a
<br />Santa Ana, California. City of Santa Ana. Electrical Engineer.
<br />eesssional
<br />zoos,
<br />46104 i
<br />Michael Baker was retained by the City of Santa Ana to
<br />perform a preliminary study of two stormwater pump stations 3
<br />Additional Projects:
<br />located within the Civic Center area. Both pump stations have
<br />0 Whittler Pumping Plant No. 2
<br />been experiencing leakage and flooding problems during the EI
<br />Replacement
<br />Nino season of 2016 and the City intends to upgrade the lift 3
<br />� Mesa water District, Well
<br />stations before the next large storm event. The preliminary
<br />9 P ry
<br />Automation and Rehabilitation
<br />Project, Costa Mesa
<br />study included on-site Inspections and visual assessments of
<br />r Sunflower Pump Station,
<br />the structure, electrical equipment, mechanical equipment, and
<br />Fountain valley, orange
<br />general conditions of each facility and provided proposed
<br />county sanitation District z
<br />recommendations.
<br />i, San Vicente Pump Station,
<br />San Diego County Water
<br />North Bank Lift Station Upgrades, San Buenaventura,
<br />Authority x
<br />California. City of San Buenaventura. Provided QA/QC for the
<br />0 Sewer Pump Station 35, City
<br />r
<br />project design and evaluated project constructability. Michael r
<br />of San Diego
<br />Baker developed a comprehensive PDR that considered four
<br />� B 649 Wastewater Pump F
<br />Station Rehabilitation at Naval
<br />upgrade alternatives and corresponding cost estimates to I
<br />Pg P 9 I
<br />Air Station North Island, San
<br />address both capacity limitations and operation and
<br />Diego
<br />maintenance issues. Michael Baker then completed final 1
<br />r B 356 Wastewater Pump
<br />design of the selected upgrades which consist of.. i
<br />Station Rehabilitation at Naval
<br />Air Station North Island
<br />Removal of three (3) existing VFDs and installing four (4)
<br />65th & Herrick Pump Station,
<br />new PowerFlex 753 VFDs.
<br />California. City of San Diego
<br />• Installing new wiring between new VFDs and new motors. !
<br />' Tract 5325 Warwick Pump
<br />Installing additional digital input and analog output card for ,
<br />Station
<br />Couser Canyon Pump Station,•_
<br />PLC.
<br />Valley Center Municipal Water:
<br />• Providing 1/0 connection Diagram for the SCADA
<br />District
<br />Integrator to program existing PLC.
<br />• Removal of existing in-line grinder electrical distribution
<br />and control panel and wiring. I
<br />i n r e n x Ar i a x u Marek Przywara, P.E.
<br />25B-55