Laserfiche WebLink
PROPOSAL <br />Civic Center 5tormwoterLi(t5totionRenovation Designs <br />ervices <br />Marek Przywara, P.E. <br />Lead Electrical Engineer <br />y <br />Mr. Przywara has served as a project manager and/or s <br />electrical/controls engineer on the numerous water/wastewater gg <br />facilities Including wastewater treatment plants, pump stations, f <br />Years of Experience: 34 <br />sewer stations, reservoirs, solid waste facilities, desalt plants, <br />etc. Duties included overall responsibility for engineering, <br />EducatloNTreining: <br />M.S., 1974, Electrical <br />project management, development and design implementation, <br />Engineering, AGH University <br />supervision and approval of documentation and drawings, <br />of Science & Technology <br />calculations and analysis, schedules, specifications, cost <br />B.S., 1972, Electrical <br />estimates, and coordination with vendors and clients. Mr. <br />Engineering, AGH University <br />of Science &Technology <br />Przywara has provided electrical and controls engineering and <br />project management services for water and wastewater districts, ; <br />Licenses/Certifications: <br />municipalities, and utilities. ° <br />Professional Engineer- <br />Electrical, California, 1994, a <br />Project Experience <br />14537 <br />Civic Center Stormwater Lift Stations — Preliminary Study, <br />ProfessionalEngineer -n, <br />ro a <br />Santa Ana, California. City of Santa Ana. Electrical Engineer. <br />eesssional <br />zoos, <br />46104 i <br />Michael Baker was retained by the City of Santa Ana to <br />perform a preliminary study of two stormwater pump stations 3 <br />Additional Projects: <br />located within the Civic Center area. Both pump stations have <br />0 Whittler Pumping Plant No. 2 <br />been experiencing leakage and flooding problems during the EI <br />Replacement <br />Nino season of 2016 and the City intends to upgrade the lift 3 <br />� Mesa water District, Well <br />stations before the next large storm event. The preliminary <br />9 P ry <br />Automation and Rehabilitation <br />Project, Costa Mesa <br />study included on-site Inspections and visual assessments of <br />r Sunflower Pump Station, <br />the structure, electrical equipment, mechanical equipment, and <br />Fountain valley, orange <br />general conditions of each facility and provided proposed <br />county sanitation District z <br />recommendations. <br />i, San Vicente Pump Station, <br />San Diego County Water <br />North Bank Lift Station Upgrades, San Buenaventura, <br />Authority x <br />California. City of San Buenaventura. Provided QA/QC for the <br />0 Sewer Pump Station 35, City <br />r <br />project design and evaluated project constructability. Michael r <br />of San Diego <br />Baker developed a comprehensive PDR that considered four <br />� B 649 Wastewater Pump F <br />Station Rehabilitation at Naval <br />upgrade alternatives and corresponding cost estimates to I <br />Pg P 9 I <br />Air Station North Island, San <br />address both capacity limitations and operation and <br />Diego <br />maintenance issues. Michael Baker then completed final 1 <br />r B 356 Wastewater Pump <br />design of the selected upgrades which consist of.. i <br />Station Rehabilitation at Naval <br />Air Station North Island <br />Removal of three (3) existing VFDs and installing four (4) <br />65th & Herrick Pump Station, <br />new PowerFlex 753 VFDs. <br />California. City of San Diego <br />• Installing new wiring between new VFDs and new motors. ! <br />' Tract 5325 Warwick Pump <br />Installing additional digital input and analog output card for , <br />Station <br />Couser Canyon Pump Station,•_ <br />PLC. <br />Valley Center Municipal Water: <br />• Providing 1/0 connection Diagram for the SCADA <br />District <br />Integrator to program existing PLC. <br />• Removal of existing in-line grinder electrical distribution <br />and control panel and wiring. I <br />i n r e n x Ar i a x u Marek Przywara, P.E. <br />25B-55 <br />