PROPOSAL - �<
<br />Civic Center5tormwoterLiftStotionRenovation Design Saivlces . 'FW
<br />Fabio Sanchez -Duran, P.E., S.E., SECB
<br />Structural Engineer
<br />Mr. Sanchez -Duran specializes in structural design. He has
<br />extensive background in the seismic analysis and design of both
<br />steel and reinforced concrete, and specialized in static and
<br />dynamic analysis of buildings in regions of moderate to high
<br />seismic hazards. His experience includes seismic design and
<br />retrofit of concrete bridges as well as pump stations, and water
<br />storage reservoirs. In addition to his knowledge of classical
<br />design methods, his expertise includes the use of state-of-the-
<br />art design software.
<br />Project Experience
<br />Los Alamitos Pump Station and Retarding Basin, Orange
<br />and Los Angeles Counties, California. County of Orange.
<br />Structural Engineer, Michael Baker prepared plans,
<br />specifications, and estimates for a new 800 cfs storm water
<br />pump station with engine driven pumps to replace the existing
<br />Los Alamitos facility for the County of Orange. The project
<br />included four natural gas engine driven mixed flow pumps, and
<br />a sump pump system with a capacity of 3,000 gpm. Work
<br />Included preparation of a value engineering report, final
<br />engineering report, hydrology and hydraulic routing, best
<br />management practices for improving water quality, inspection
<br />and analysis of existing 2,400 If of 54 -inch discharge piping,
<br />Phase I and II environmental assessments, geotechnical
<br />Investigation, CEQA, permit processing, and coordination with
<br />agencies and homeowner associations. Michael Baker also
<br />provided structural design for the new facility. The structure is
<br />an above grade engine room and pump room with a below
<br />grade wet well leading to the retarding basin with an inlet apron
<br />and series of trash racks.
<br />Walnut Avenue Overcrossing Pumping Plant, Orange
<br />County, California. Caltrans. Engineer. Responsibilities
<br />Included all aspects of structural design, from layout through
<br />final drafting. Michael Baker provided design services for a
<br />stormwater facility to discharge runoff from the Eastern
<br />Transportation Corridor (ETC) located between the northbound
<br />ETC Frontage Road and Peter Canyon Channel, close to the
<br />Intersection between Jamboree Road and Walnut Avenue.
<br />Orange County Flood Control On -Call Contract, Orange
<br />County, California. County of Orange. Structural Engineer.
<br />Responsibilities included preparing Independent check
<br />calculations and reviewing final plans for this bridge spanning
<br />over the Santa Ana River. Michael Baker provided flood control
<br />planning and engineering services to support flood control. The
<br />Years of Experience: 38
<br />Educationntraining:
<br />B.S., 1980, Civil Engineering,
<br />PontHicla Universidad
<br />Javerlana Bogota, Colombia
<br />LlcensesfCar dficatlo ns:
<br />Professional Engineer- Civil,
<br />California, 1994, 52764
<br />Structural Engineer, California,
<br />1998, 4234
<br />Registered Disaster Service
<br />Worker, California, 2003,
<br />10246
<br />Professional Engineer - Civil,
<br />1981,10272
<br />Structural Engineer, 2005, USA-
<br />SECB,1437-0705
<br />INTIIMOTIOKAO Fabio Sanchez -Duren, P.E., S.E., SECB
<br />25B-63
<br />
|