Laserfiche WebLink
adjacent to all improved hard surfaces such as concrete, decomposed granite, asphalted <br />concrete paved areas, pavers, etc. <br />Edging/detailing may occur with string trimmers around park amenities that are not <br />immediately adjacent paved surfaces. <br />Chemical detailing of turf may occur only with the Director's Representatives approval, If <br />chemical detailing is performed, the Contractor shall spray maximum 3" and use the string <br />trimmer to remove the treated turf within one (1) week after symptoms of phytotoxicity <br />become recognizable. <br />The Director's Representative may require the Contractor to use string or rope lines to edge <br />straight lines if the Contractor's staff fails to achieve this quality without this method. <br />The Contractor shall detail around trees, along walls/fences and other park amenities first <br />using a sharpened shovel cut to establish a concentric round circle around trees, poles, etc. <br />Once the initial detailed circle is established a string trimmer may be used to maintain the <br />circle. Should the circle begin to deform the Director's Representative shall direct the <br />Contractor to repeat the detail process, Shovel cut detailing shall be repeated a minimum <br />of every 3 months to maintain crisp evenly round lines. <br />The Contractor shall detail turf not greater than 1" away from park amenities walls or <br />fences. Detail lines shall be made straight and shall be maintained straight. The Contractor <br />shall, at his own cost, supply sandy loam top soil and an approved turf sod to reduce any <br />existing bare soil areas along walls/fences that are greater than I". <br />2.0 Irrigation <br />2.1 Contractor shall ensure irrigation systems are continually monitored and repaired in a <br />timely manner and per the Director's Representatives direction. The Contractor shall <br />visually check all sites each morning and physically check each sites systems monthly <br />indicating in writing the: 1) site name; 2) the controllers manufacturer, model and serial <br />number; 3) controller letter/number; 4) run days; 5) start times; 6) station run times; 7) <br />water budget percentage; 8) weekly Et; 9) deficiencies noticed; and, schedule to cure/repair <br />deficiencies. <br />2.2 When an irrigation system does not adequately provide water to the priority turf area in <br />which it is installed, due to any reason including but not limited to controller failure, valve <br />failure, broken heads, poor system design, etc., the Contractor shall direct (heir staff to <br />immediately provide supplemental irrigation at no extra cost to the City. The Contractor <br />may use any reasonable means necessary to uniformly irrigate priority turf areas. <br />Contractor may also submit AEWs with engineered drawings to improve these areas of the <br />system. Failure to maintain priority turf in a green and healthy condition will result in <br />deductions from the monthly invoice. <br />23 Irrigation System Maintenance <br />2.3,1 Inspection and Reporting- The Contractor shall maintain all sprinkler systems using <br />City standard irrigation products and details. All repairs shall be to City of Santa <br />Ana Park Services' specifications and details. Repairs to irrigation heads shall be <br />_ G ty of Santa Ana NPP 18-030 <br />Page 11 <br />