My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARIPOSA LANDSCAPE, INC.
Clerk
>
Contracts / Agreements
>
M
>
MARIPOSA LANDSCAPE, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2022 10:30:07 AM
Creation date
7/17/2018 2:42:16 PM
Metadata
Fields
Template:
Contracts
Company Name
MARIPOSA LANDSCAPE, INC.
Contract #
A-2018-167
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
6/19/2018
Expiration Date
1/31/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant Responsibilities: <br />1.0 GENERAL CONDITIONS <br />1.1 Definitions- <br />L 1.1 "Director's Representative" shall mean the Executive Director of Parks, Recreation <br />and Community Services designated representative. <br />1.1.2 "SAPRF" shall mean Santa Ana Park and Recreation Facilities. <br />1.1.3 "Pruning" shall mean the practice of removing lateral shrub or tree branches and <br />may also be referred to as "trimming." <br />1.1.4 "Weed" shall mean any undesirable or misplaced plant, <br />1.1.5 "Hardscape" shall mean any resilient surface other than turf or planting beds, such <br />as but not limited to curbs, gutters, sidewalks, decomposed pathways, asphalt <br />pavement, mowstrips, etc. <br />1.2 Scheduling of Work -The Contractor shall provide landscape/grounds maintenance <br />between the hours of 6:00 a.m. and 6:00 p.m., Monday through Sunday. The schedule may <br />be modified only with the Director's Representative consent, Landscape/grounds <br />maintenance that gencrates excess noise cannot begin before 8:00 a.m. <br />The Contractor shall establish schedules of "routine work" to be followed in the <br />performance of this contract. In addition to the Contractor submitting the Monthly Park <br />Maintenance Inspector's hnspection Schedule and other required monthly reports, the <br />Contractor shall submit weekly schedules listing the work tasks, crew performing the task, <br />and the projected hours to complete the task. The schedules shall be entailed to Director's <br />Representative by Thursday at 4:00pm for the upcoming week. Any changes in scheduling <br />shall be reported in writing 48 hours before the proposed change and must be approved by <br />the Director's Representative. The schedule shall 'include days of the week and what <br />person/crew will be performing specific work in accordance with the specification. <br />1.3 Local Office -The Contractor shall maintain a physical office within the 714 area code <br />(local office). The local office shall be open Monday through Friday 8:00 a.m, to 5:00 p.m. <br />with a company representative present at all times. Answering services or mobile <br />telephones will not be considered a local office. <br />1.4 Outside the Scope of Work -Damage or malfunction to plant material or irrigation system <br />equipment (from valve to water meter), with the exception of irrigation heads and lateral <br />lines, by any of the following may be considered outside the scope of this Agreement: <br />-Acts of God <br />-Civil Disorder <br />-Vehicle Collision (excluding Contractor and its employees and subs) <br />-Excavation or re -surfacing of the street <br />-Power failures <br />-Underground wiring damage <br />Contractor will not be considered responsible for replacement, Contractor must prove to <br />the satisfaction of Director that one of the above occurred in order to be excused from <br />performing Linder the Agreement. <br />�A---�—City of Santa Ana RFP 1 fi-030 <br />Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.