Laserfiche WebLink
5.1 Underground Alert Systems (telephone number 1-800-422-4133) must be notified 48- <br />hours in advance prior to any excavation work. <br />6.0 PROPERTY DAMAGE <br />6.1 Any damage to private property caused by Contractor shall be immediately reported to the <br />property owner. Contractors shall pay for any darnage caused to private property in <br />performing this agreement. <br />7.0 ACCESS TO PRIVATE PROPERTY <br />7.1 Prior to any work involving private property, the Contractor shall notify the City of the <br />proposed work and obtain all necessary permits and/or consent required from City and/or <br />property owner <br />8.0 PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS <br />8.1 The Contractor shall protect City and/or private property adjacent to work areas including <br />sprinkler systems, drain pipes, lawns, brick work, plantings, masonry work, fences, walls, <br />sidewalks, street paving, etc., located on either public or private property. Contractor shall, <br />at its expense, replace any property that is removed or damaged, other than property pre - <br />approved for removal. Contractor shall abide by the City's "Policy for Driving on Park <br />Property" (See Attachment 4), <br />9.0 TRAFFIC CONTROL <br />9.1 The Contractorwill not interrupt traffic flow on City streets without obtaining a no -fee <br />permit from the City. Prior to performing maintenance activities where Contractor <br />employees world immediately adjacent City vehicular lanes or any other situation covered <br />under the California MUTCD, the Contractor shall implement no -fee permitted City <br />approved traffic safety plans to protect the health and welfare of its employees and the <br />general public prior to commencement of the agreement. <br />10.0 MONTHLY REPORTS <br />10.1 Prior to the first of each month the Contractor shall submit to the Director's Representative <br />for approval: 1) the Excel Park Maintenance Inspector's Inspection Schedule including a <br />detailed annual, monthly, weekly and daily work schedules consistent with task <br />frequencies in Exhibit A; 2) certified payroll of employees assigned to the contract areas; <br />3) organizational chart or equal listing the names, titles, schedules and assignments of all <br />persons working on the project; 4) invoices and packing slips of name, type and quantities <br />of commodities purchased; 5) annual/monthly pesticide use report completed on the City's <br />Excel form; 6) irrigation report including, but not limited to, name of park/facility, location <br />in park/facility, controller letter, station numbers and their description (priority turf, casual <br />turf, groundcover, shrub, annual color) days of week on/off, run times, start times, water <br />budget percent, weekly ET, percent of ET programmed, a detailed description of system <br />deficiencies and schedule of repairs; and, 7) "green waste" recycling report. <br />City of Santa Ana RFP 18-030 <br />Page 21 <br />