My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ANDERSONPENNA PARTNERS, INC.
Clerk
>
Contracts / Agreements
>
A
>
ANDERSONPENNA PARTNERS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 11:22:07 AM
Creation date
7/17/2018 2:52:28 PM
Metadata
Fields
Template:
Contracts
Company Name
ANDERSONPENNA PARTNERS, INC.
Contract #
A-2018-159-04
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
8/1/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Professional On -tali Engineering Services City of Santa Ana <br />RFP No. 17-083 <br />City of Santa Fe Spring Services: Engineering I Matt Stapler, PE — PM <br />Noe Negrete, Director of PW Start: 2015 Complete: Ongoing Joe Buckner, PE— Roadway Eng. <br />(S62) 868.0511 Miguel Hurtado, PE —Design <br />APP is providing a broad range of professional engineering services in support of and in close <br />coordination with the City's Public Works/Engineering Division. These services will be provided on an <br />as -needed basis through a Request for quote for each specific project. The APP team will provide all <br />services required for this on-call professional engineering services contract including; engineering; <br />structural engineering; engineering staff augmentation; construction management and inspection; <br />architecture; and landscape architecture. Projects to date include: <br />inFlorence Avenue Widening (Orr and Day Road to Pioneer Boulevard) — <br />APP is preparing PS&E for this roadway design project to accommodate three <br />lanes of travel in the westbound and eastbound directions. APP is responsible <br />for performing street cores samples and percolation test data; design survey; <br />designing a longitudinal bioswale; storm drain relocations; designing options <br />for pavement, curb, and gutter sidewalk, driveway; construction estimates for <br />each design option in Microsoft Excel; water main replacement; signing, striping and traffic signal <br />revisions; obtaining UPRR permits; and preparing construction specifications. <br />Parkmead Street Improvement Design - APP provided street design services <br />for Parkmead Street from Jersey Avenue to Pioneer Boulevard in Santa Fe <br />Springs. The project entailed the total reconstruction of the curb/gutter, <br />pavement rehabilitation, reconstruction of deteriorated sidewalk and <br />driveways and replacement of the street trees (which had contributed <br />significantly to pavement and curb uplift). The recommended pavement <br />rehabilitation resulted in significant construction cost savings by avoiding the <br />total reconstruction of the existing pavement section. <br />ti• Citywide Pavement Evaluation and Analysis - APP is evaluating, analyzing <br />and prioritizing the City's entire roadway system. The project involves field <br />work to evaluate the roads, pavement curings to determine the existing <br />street structural section, identifying recommended strategies to rehabilitate <br />the streets, development of construction cost estimates and a 3 -year <br />prioritization of the various projects based on the City's budget of $17 million. In conjunction with <br />APP'S recommendations, We are proposing an extensive amount of pavement recycling (FDR, CIR, <br />CCPR) which will save the City up to 50% on the pavement construction costs, allowing the City to <br />significantly stretch their pavement resources. Additionally, for several the streets, we are proposing <br />to reutilize the existing base material and just recycle the A.C. portion of the pavement. <br />Citywide Sidewalk Evaluation and Analyses - APP is providing engineering <br />services for sidewalk inspection of the City's entire sidewalk system. The <br />scope of work Includes: development of recommendations to remedy tripping <br />hazards and non -ADA compliant sidewalks; preparation of a summary report <br />including construction cost estimates; and incorporation of the evaluation <br />results and recommendations Into the City's existing GIS system. The project <br />requires extensive experience and familiarity with the maintenance and <br />repair of local sidewalks. APP is responsible for providing data that is compatible with the City's <br />existing XY-Maps GIS -based system. <br />ANDFRSUN-PINNA <br />
The URL can be used to link to this page
Your browser does not support the video tag.