Professional On-call Engineering Services City of Santa Ana
<br />RFP No, 17-083
<br />4. References
<br />Noe Negrete, PE, Director of Public Works/City Engineer
<br />Agency: City of Santa Fe Springs
<br />Phone: (562) 409.7611 Email: noenegrete@santafesprings.org
<br />Names of Projects: Parkmead Reconstruction, Citywide Pavement and Sidewalk Evaluation
<br />Description of Services Provided: Survey, field work, reports, street and utility PS&E, geotech, cost
<br />estimates, traffic, WQMP, storm drain
<br />Sean Crumby, PE, Deputy Public Works Director
<br />Agency: City of long Beach
<br />Phone: (562) 570-6383 Email: Sean.Crumby@LongBeach.gov
<br />Names of Projects: Santa Fe Rehabilitation, Seaside Storm Drain, East 20" Street Intersection
<br />Improvements, 6th Street Storm Darin
<br />Description of Services Provided: Aerial mapping, design survey, cross-sections, geotech, street and
<br />storm drain PS&E, traffic planning and engineering
<br />Rowena Jarcla, PE, Associate Engineer
<br />Agency: City of Anaheim
<br />Phone: (714) 765-4913 Email: RJarcia@anaheim.net
<br />Names of Projects: La Palma/State College Intersection Improvements
<br />Description of Services Provided: Aerial mapping, design survey, cross-sections, legal descriptions and
<br />plats, geotech, street and storm drain PS&E, wall design, traffic planning and engineering
<br />Mark Trestik, PE
<br />Agency: City of Laguna Beach
<br />Phone: (949) 497-0300 Email: mtrestik@lagunabeachcity.net
<br />Names of Projects: Broadway Pedestrian and Safety Improvements, Hillcrest Sidewalk, Park Avenue
<br />Sidewalk, Storm Drain Master Plan, Temple Hills Sidewalk
<br />Description of Services Provided: Design survey, cross-sections, geotech, street and storm drain PS&E,
<br />sidewalk PS&E, wall design, traffic planning and engineering
<br />5. Scope of Work
<br />PHASE 1: PRELIMINARY ENGINEERING
<br />Research and Field Review
<br />A thorough search of the available records will be conducted to acquire relevant data to assist in the
<br />design of the project. The information accumulated will Include as -built drawings, utility information,
<br />and horizontal and vertical control data.
<br />The Project Team will review the project in the field and take photographs of potential problem areas
<br />or Items that need special attention. Particular emphasis will typically be given to identifying areas
<br />where existing improvements are in a deteriorated condition, pose a significant design constraint or
<br />could be impacted by the widening (utilities, walls, structures, driveways, etc.).
<br />Utility Coordination
<br />Information will be collected from all the utility companies. Coordination with the utilities will continue
<br />throughout the design of the project. A copy of the utility file will be provided to the City. For this
<br />project we have assumed no utility potholing will be required.
<br />ANDFRSON PENNA
<br />
|