Laserfiche WebLink
+I TAIT <br />nuau vo rill uPAurom 701 N. PoiAcunmr DOM Sonia Ano, CA 44705 <br />0171 410 6016 300 ww..lauxom <br />David Sloan, PE, Director of Engineering for TAIT will serve as aro Alternate/Deputy Project Manager for the <br />City's projects,. David's career has been rooted exclusively In the public sector, His background and experience <br />with local federally funded public works projects, especially roadway Improvements, will be invaluable to the <br />City. <br />Me, D. Todd Schmieder, PE, QSD/P will art as TAIT's OA/QC Manager for this contract, Todd will also act as the <br />Alternate Project Manager should it be deemed necessary based on the project's specific requirements, Todd, <br />who currentlyserves as the County of Orange plan check manager for TAIT, has 88 years of experience In a <br />variety of pub Ile works projects. He Is also a certified QSD/P and Isthe best candidate to review the design <br />documents For the Clty to ensure they are to the standards required and free of error prior to submittal to the <br />City, Mr, Schmieder's broad background ranges from planning and design of the Orange County Toll Roods to <br />preparing construction documents to Orange County' new Animal Care Facility In Tustin, <br />In addition to the noted KeyStaff, TAIT boasts a wide array of 150 associates Including Engineers, Architects, <br />Surveyors, Storm Water Practitioners, Geologists, Contractor's,.and quality design engineers, The Cltycan be <br />assured that the necessary support and availability of staff will be provided on each contract that Is assigned to <br />us. For our as -needed sub -consultants, we've teamed with tried and true partners who have worked with TAIT <br />on numerous projects. TJW offers thorough Traffic Engineering services, LAE provides Federal Funding <br />assistance, BTL performs preclse Potholing and other subsurface Investigations, GMU:supplias expert <br />geotechnical services, and RJM is our experienced Landscape Architecture consultant, <br />Scope of Work, it Is understood that this engineering proposal Is for an on-call contract that includes potential <br />design services including street improvements, traffic engineering, storm drain Improvements, sewer, water and <br />wastewater Improvements, as well as plan checks of the above mentioned, and other engineering services <br />associated wlth.municipal public works. TAIT's noted diverse staffing and background In multifaceted projects <br />are Ideally suited for the City's wide range of anticipated needs and projects, Upon Issuance of on RFP, TAIT will <br />actively review the project requirements and will provide a project specific proposal for the City's consideration, <br />Commitment to Service, We aim to act as on extension of the City's staff and place an emphasis on Customer <br />Service which has been and will remain one of TAIT's Corporate Goals "To Completely Satisfy our Customers". <br />Centractlt reoirta7tt5tatament. TAIT concurs with all provisions as contained in the Agreement in Attachment 2 <br />of the RFP, <br />Jacob Vandervls Is the authorised maln point of contact for TAIT's <br />services and can be reached In our Santa Aria office at phone number <br />714-560-8200 ext. 677, email jaco,v VJt_,cox�,, and address 701 Park <br />Center Drive, Santa Ana, CA, where the contract will be managed. We <br />thank you for this opportunity to submit our quallficatiohs and look <br />forward to furthor discussing with you our capabilities and commitment <br />to working With the City of Santa Ana, <br />Very truly yours, <br />T T & A/SS'O/CIATES, INC. <br />Y U4` G'. <br />1 ob Vandervis, Z. <br />hlaf Operatlons Officer and Vice president I <br />TAIT <br />TAIT's legal name isTwt & <br />Associates, Inc., and wa are <br />R California Corporation <br />(Ce405510) headquartered <br />at 703 Parikcontee Drive In <br />the city of Santa Ana, CA. <br />Page 12 <br />