<br />David Sloan, PE, Director of Engineering for TAIT will serve as aro Alternate/Deputy Project Manager for the
<br />City's projects,. David's career has been rooted exclusively In the public sector, His background and experience
<br />with local federally funded public works projects, especially roadway Improvements, will be invaluable to the
<br />City.
<br />Me, D. Todd Schmieder, PE, QSD/P will art as TAIT's OA/QC Manager for this contract, Todd will also act as the
<br />Alternate Project Manager should it be deemed necessary based on the project's specific requirements, Todd,
<br />who currentlyserves as the County of Orange plan check manager for TAIT, has 88 years of experience In a
<br />variety of pub Ile works projects. He Is also a certified QSD/P and Isthe best candidate to review the design
<br />documents For the Clty to ensure they are to the standards required and free of error prior to submittal to the
<br />City, Mr, Schmieder's broad background ranges from planning and design of the Orange County Toll Roods to
<br />preparing construction documents to Orange County' new Animal Care Facility In Tustin,
<br />In addition to the noted KeyStaff, TAIT boasts a wide array of 150 associates Including Engineers, Architects,
<br />Surveyors, Storm Water Practitioners, Geologists, Contractor's,.and quality design engineers, The Cltycan be
<br />assured that the necessary support and availability of staff will be provided on each contract that Is assigned to
<br />us. For our as -needed sub -consultants, we've teamed with tried and true partners who have worked with TAIT
<br />on numerous projects. TJW offers thorough Traffic Engineering services, LAE provides Federal Funding
<br />assistance, BTL performs preclse Potholing and other subsurface Investigations, GMU:supplias expert
<br />geotechnical services, and RJM is our experienced Landscape Architecture consultant,
<br />Scope of Work, it Is understood that this engineering proposal Is for an on-call contract that includes potential
<br />design services including street improvements, traffic engineering, storm drain Improvements, sewer, water and
<br />wastewater Improvements, as well as plan checks of the above mentioned, and other engineering services
<br />associated wlth.municipal public works. TAIT's noted diverse staffing and background In multifaceted projects
<br />are Ideally suited for the City's wide range of anticipated needs and projects, Upon Issuance of on RFP, TAIT will
<br />actively review the project requirements and will provide a project specific proposal for the City's consideration,
<br />Commitment to Service, We aim to act as on extension of the City's staff and place an emphasis on Customer
<br />Service which has been and will remain one of TAIT's Corporate Goals "To Completely Satisfy our Customers".
<br />Centractlt reoirta7tt5tatament. TAIT concurs with all provisions as contained in the Agreement in Attachment 2
<br />of the RFP,
<br />Jacob Vandervls Is the authorised maln point of contact for TAIT's
<br />services and can be reached In our Santa Aria office at phone number
<br />714-560-8200 ext. 677, email jaco,v VJt_,cox�,, and address 701 Park
<br />Center Drive, Santa Ana, CA, where the contract will be managed. We
<br />thank you for this opportunity to submit our quallficatiohs and look
<br />forward to furthor discussing with you our capabilities and commitment
<br />to working With the City of Santa Ana,
<br />Very truly yours,
<br />T T & A/SS'O/CIATES, INC.
<br />Y U4` G'.
<br />1 ob Vandervis, Z.
<br />hlaf Operatlons Officer and Vice president I
<br />TAIT
<br />TAIT's legal name isTwt &
<br />Associates, Inc., and wa are
<br />R California Corporation
<br />(Ce405510) headquartered
<br />at 703 Parikcontee Drive In
<br />the city of Santa Ana, CA.
<br />Page 12
<br />
|