�r
<br />TAIT& Associates, Inc,
<br />On -Call Engineering Services
<br />On-site Storm Drain design Including Hydraulic calculatlons and utilization of the
<br />most current Low Impact OMPs.
<br />Orange County Animal Care Pacillty, City of Tustin, Project Engineer, 2016'
<br />Chris Is currently a Project Engineer on this Orange County Animal Care Facility Rp
<br />in the City of Tustin. The project Includes Public Sewer, Water, vire Water, „
<br />Water Quality, On-site Utilities, and Grading plans, Chris Is responsible far Che
<br />public Sewer, Water, and Fire Water pians
<br />Vons•Albortsons Distribution Center, City of EI Monte, protect Engineer, 2016 Il
<br />Chris Is currently the Project Engineer on this 36 acre Industrial Project which p I
<br />Includes Demolition, Grading, and Utility Research. Chris is responsible forthet
<br />Demotion, and Grading Plans as well as coordination with Utility Providers,
<br />These plans Include the removal and disposal of Hazardous materials as well as
<br />the protection of existing ground•watar monitoring wells and grading design
<br />i
<br />which duplicates existing flow. patterns, v '
<br />Limonite Marketplace, City of Jurupa Valley, Assistant Project Manager, 2015
<br />Chris was the Assistant Project Manager and Engineer for this 39 acre mixed use F a
<br />development In the City of Jurupa Valley, This mixed use project combined "f
<br />1.1
<br />Retail development with private, high-density, residential. Chris was responsible
<br />for the Tentative Tract and Parcel Maps, Site Development Plan, on and off-site
<br />Street Improvements, Water Quality, Hydrology, Storm Drain, Rough Grading,
<br />and Precise Grading Plans, Off-site Street Improvement Plans included P
<br />relogtinn of traffic signals, roadway Widening, now signing and striping,
<br />addition of ADA ramps, bus turn -outs, and horse trails, and development of 1
<br />mile of unpaved rural dirt road. P
<br />Stoneridge, County of Riverside, Assistant Project Manager, 2015
<br />Chris was the Assistant Project Manager and Engiheerfor this 700 acre Master -
<br />Planned residential community In Riverside County, This project Included n
<br />Tentative Maps, Phasing Exhibits, Street Improvements, Water Quality,
<br />Hydrology, Storm Drain, Rough Grading, Precise Grading, and Traffic Studies, F
<br />s
<br />Chris was responsible for street Improvement, Rough Grading, Storm Drain, and
<br />Phasing of this project. Street Improvement plans Included the development of
<br />-t.
<br />20 miles of new roadway along with signing, stripping and slgnallzatlon.
<br />Crossroads at Chino Hills, City of Chino Hills, Assistant Project Manager, 2015
<br />Chris was the Assistant Project Manager and Engineerfor this 15 acre high t
<br />density residential development. This project included on-site Street, Utility, h
<br />Storm Drain, Water Quality, and Grading, Chris was responsible for on-site f
<br />Street, Sewer, Water, Grading and Storm Drain design.
<br />�I
<br />TAIT 11+" Appendix I Page 13
<br />wu
<br />
|