Laserfiche WebLink
Clty of Sant Ana <br />David Knell, PLS <br />Survey and Right-of-Way Engineering Task Leader <br />Profile Summary <br />Education: SS, Cartography, Boston University, Boston <br />Civil Engineering and Land Surveying Classes, California State University, Long Beach <br />�^ <br />Registration: Land Surveyor, California No. 5301 <br />Affiliations: California Land Surveyors Association <br />Southern California Experts & Consultants <br />Experience: 41 Years <br />Mr. David Knell has been Involved in preparing and checking numerous parcel maps and tract maps, ALTA <br />surveys, records-of-survey, lot line adjustments, parcel map waivers, certificates of compliance, and bound- <br />ary determination. He Is responsible for preparing legal descriptions and sketches for a wide range of ease- <br />L4 <br />ments Involving utilities, air space reservations, and construction projects. Mr. Knell works with major utlll- <br />ties and title companies in determining easements and correcting defective legal descriptions, HIs experl- <br />once includes supervising field crews, overseeing an office staff dealing with various survey projects, and <br />I'•7 <br />extensive experience with local, state, and federal agencies. <br />; <br />Relevant Project Experience <br />Emerald Bay Main Gate Safety Improvements, Emerald Bay Service District, Laguna Beach, Callfor- <br />, <br />' Ms. Survey and Right-of-Way Engineering Task Leader responsible for oversight of all office and field sur- <br />vey services and preparing necessary right-of-way engineering documentation, Wllidan provided civil and <br />traffic engineering design and other appurtenant services for safety <br />Improvements at the main gate an- <br />fw <br />trance, improvements Involved road widening, guardhouse relocation <br />and reconstruction; grading to accom- <br />�a <br />madats-the_roadway_vuidening-andJandseaping;_Inatatl.in%iWr.adedU[ hting,-Ai3A=cnm. pHant.curbs_and <br />ramps, and retaining and monument walls; widening the right-turn pocket and installing a median; and In- <br />stalling street striping and signage within Caltrans' right-of-way. <br />Firestone Boulevard Capacity Enhancement, City of South Gate, California. Survey Task Leader re- <br />sponsible for providing and overseeing all mapping and right-of-way engineering required for the corridor <br />r' <br />Improvements from Alameda Street to Hunt Avenue. The improvements involved roadway widening from <br />L-> <br />four to six lanes; pavement rehabilitation; landscape and hardscape medians; median lighting; sidewalk, <br />curb and gutter, and driveway approach reconstruction; ADA-compllant ramps; parkway trees; artistic ele- <br />.,,x <br />merits, corridor entrance monument; bus shelter and bus turnouts; and traffic signal modifications. Services <br />provided Included civil, traffic, pavement, and drainage engineering; landscape architecture, survey and <br />rlght-of-way engineering; and utility relocation. <br />Orange Line Extension, Brutoeo Engineering & Construction, IncJLos Angeles County Metropolitan <br />I. } <br />Transportation Authority, Los Angeles, California. Survey Task Leader responsible for providing and <br />overseeing all mapping and right-of-way engineering required for the design/bulld of the MOL extension <br />17 <br />from the Chatsworth Station to Canoga Station in the San Fernando Valley along Canoga Avenue. Willdan <br />prepared plans, specifications, and estimate for street widening, raised landscaped medians; Irrigation sys- <br />tem, ADA access curb ramps, bicycle paths, park-and-ride and parking lot facilities, traffic signal modifica- <br />tions, communication conduits, and signing and striping, <br />Los Alamitos Boulevard Median Improvements, City of Los Alamitos, California. Survey Task Leader <br />responsible for providing and overseeing all mapping and right-of-way engineering required for the Improve- <br />�. <br />ments between Cerritos Avenue and Katella Avenue, Improvements Involved raised median, pavement de- <br />i <br />lineation, landscape and Irrigation Improvements, street lighting and traffic signal improvements at Intersec- <br />tions with Florists Street and Sausalito Street. There was also minor traffic signal modification at Intersec- <br />tions with Katella Avenue and Cerritos Avenue. <br />J <br />Proposal for On-Call�ngingoring, 4.^ <br />Comprehensive.Innovative. l'rusted RFP No. 17.083 <br />4.J <br />