Clty of Sant Ana
<br />David Knell, PLS
<br />Survey and Right-of-Way Engineering Task Leader
<br />Profile Summary
<br />Education: SS, Cartography, Boston University, Boston
<br />Civil Engineering and Land Surveying Classes, California State University, Long Beach
<br />�^
<br />Registration: Land Surveyor, California No. 5301
<br />Affiliations: California Land Surveyors Association
<br />Southern California Experts & Consultants
<br />Experience: 41 Years
<br />Mr. David Knell has been Involved in preparing and checking numerous parcel maps and tract maps, ALTA
<br />surveys, records-of-survey, lot line adjustments, parcel map waivers, certificates of compliance, and bound-
<br />ary determination. He Is responsible for preparing legal descriptions and sketches for a wide range of ease-
<br />L4
<br />ments Involving utilities, air space reservations, and construction projects. Mr. Knell works with major utlll-
<br />ties and title companies in determining easements and correcting defective legal descriptions, HIs experl-
<br />once includes supervising field crews, overseeing an office staff dealing with various survey projects, and
<br />I'•7
<br />extensive experience with local, state, and federal agencies.
<br />;
<br />Relevant Project Experience
<br />Emerald Bay Main Gate Safety Improvements, Emerald Bay Service District, Laguna Beach, Callfor-
<br />,
<br />' Ms. Survey and Right-of-Way Engineering Task Leader responsible for oversight of all office and field sur-
<br />vey services and preparing necessary right-of-way engineering documentation, Wllidan provided civil and
<br />traffic engineering design and other appurtenant services for safety
<br />Improvements at the main gate an-
<br />fw
<br />trance, improvements Involved road widening, guardhouse relocation
<br />and reconstruction; grading to accom-
<br />�a
<br />madats-the_roadway_vuidening-andJandseaping;_Inatatl.in%iWr.adedU[ hting,-Ai3A=cnm. pHant.curbs_and
<br />ramps, and retaining and monument walls; widening the right-turn pocket and installing a median; and In-
<br />stalling street striping and signage within Caltrans' right-of-way.
<br />Firestone Boulevard Capacity Enhancement, City of South Gate, California. Survey Task Leader re-
<br />sponsible for providing and overseeing all mapping and right-of-way engineering required for the corridor
<br />r'
<br />Improvements from Alameda Street to Hunt Avenue. The improvements involved roadway widening from
<br />L->
<br />four to six lanes; pavement rehabilitation; landscape and hardscape medians; median lighting; sidewalk,
<br />curb and gutter, and driveway approach reconstruction; ADA-compllant ramps; parkway trees; artistic ele-
<br />.,,x
<br />merits, corridor entrance monument; bus shelter and bus turnouts; and traffic signal modifications. Services
<br />provided Included civil, traffic, pavement, and drainage engineering; landscape architecture, survey and
<br />rlght-of-way engineering; and utility relocation.
<br />Orange Line Extension, Brutoeo Engineering & Construction, IncJLos Angeles County Metropolitan
<br />I. }
<br />Transportation Authority, Los Angeles, California. Survey Task Leader responsible for providing and
<br />overseeing all mapping and right-of-way engineering required for the design/bulld of the MOL extension
<br />17
<br />from the Chatsworth Station to Canoga Station in the San Fernando Valley along Canoga Avenue. Willdan
<br />prepared plans, specifications, and estimate for street widening, raised landscaped medians; Irrigation sys-
<br />tem, ADA access curb ramps, bicycle paths, park-and-ride and parking lot facilities, traffic signal modifica-
<br />tions, communication conduits, and signing and striping,
<br />Los Alamitos Boulevard Median Improvements, City of Los Alamitos, California. Survey Task Leader
<br />responsible for providing and overseeing all mapping and right-of-way engineering required for the Improve-
<br />�.
<br />ments between Cerritos Avenue and Katella Avenue, Improvements Involved raised median, pavement de-
<br />i
<br />lineation, landscape and Irrigation Improvements, street lighting and traffic signal improvements at Intersec-
<br />tions with Florists Street and Sausalito Street. There was also minor traffic signal modification at Intersec-
<br />tions with Katella Avenue and Cerritos Avenue.
<br />J
<br />Proposal for On-Call�ngingoring, 4.^
<br />Comprehensive.Innovative. l'rusted RFP No. 17.083
<br />4.J
<br />
|