Laserfiche WebLink
city of Santa Ana <br />Mohnen Rahimlan, PE, GE <br />Material Testing Engineer <br />Profile Summary <br />Education: MS, Civil Engineering, Tehran University, Tehran <br />Registration: Civil Engineer, Callfomia, No. 73396 <br />Geotechnioal Engineer, California, No. 3059 <br />Experience: 29 Years <br />Mr. Mohsen Rahimlan possesses expertise In geotsohnlcal and material engineering, testing, Investiga- <br />tion, design, and construction and has lent that expertise to a wide spectrum of public works projects. Mr. <br />Rahlmian has substantial experience In conducting and managing geoteohnlcal and material testing and <br />Inspection services during construction, He has performed diversified geotechnical assignments, including <br />pavement design, shallow and deep foundation design, settlement evaluations, liquefaction studies, and <br />i slope stability analyses. Mr. Rahimlan experience Includes geotechnical, civil, and structural design and <br />construction management. <br />Relevant Project Experience <br />Emerald say Main Gate Safety Improvements, Emerald Bay Service District, Laguna Sesch, Callfor- <br />nla. Geotechnloal Engineer responsible for quality assurance materials testing. Wiiidan provided civil and <br />traffic engineering design and other appurtenant services for safety Improvements at the main gate an - <br />trance. improvements involved road widening, guardhouse relocation and reconstruction; grading to accom- <br />modate the roadway widening and landscaping; installing upgraded lighting, ADA -compliant curbs and <br />ramps, and retaining and monument walls; widening the right -turn pocket and Installing a median; and In. <br />stalling street striping and signage within Caltrans' right-of-way. <br />Placentia Metrolink Station Phase I and 11, Orange County Transportation Authority, Orange County, <br />California. Geotechnical Engineer responsible for quality assurancs materials testing required for Infra- <br />structure Improvements for the new station. The project site involved approximately 4.75 acres to provide a <br />Metrolink commuter rail statlon that meets current and future transit demand and ABA requirements. The <br />project goal fostered train ridershlp growth In the region, The station was planned as part of a key compo- <br />nent of transit-orlented development envisioned In the Westgate Specific Plan for the City of Placentia. The <br />project Improvements Included street, railroad track, and pedestrian improvements; rail platforms; and light - <br />Ing, signing and striping of four parking facilities for 425 vehicles. <br />Orange Line Extension, Srutcco Engineering & Construction, ]no,/Los Angeles County Metropolitan <br />Transportation Authority, Los Angeles, California. Geotechnical Englnaer responsible for quality assur- <br />ancs materials testing required for the design/build of the MOL extension from the Chatsworth Station to <br />Canoga Statlon In the San Fernando Valley along Canoga Avenue, Willdan prepared plans, specifications, <br />and estimate for street widening, raised landscaped medians, Irrigation system, ADA access curb ramps, <br />bicycle paths, park-and-ride and parking lot facilities, traffic signal modifications, communication conduits, <br />, <br />and signing and striping. <br />Firestone Boulevard Capacity Enhancement, City of South Gats, California. Geotechnical Engineer <br />responsible for quality assurance materials testing required for the corridor Improvements from Alameda <br />Street to Hunt Avenue. The Improvements Involved roadway widening from four to six lanes; pavement re- <br />habilitation; landscape and hardscape medians; median lighting; sidewalk, curb and gutter, and driveway <br />i approach reconstruction; ADA -compliant ramps; parkway trees; artistic elements, corridor entrance monu- <br />ment; bus shelter and bus turnouts; and traffic signal modifications. Services provided Included civil, traffic, <br />pavement, and drainage engineering; landscape architecture, survey and right-of-way engineering; and util- <br />ity relocation. <br />-1 <br />WIN <br />Comprehensive. Innovative. Trusted, proposal for Orn0a11 [Bgineering, <br />_� .f .� RFP No. 17.083 <br />