city of Santa Ana
<br />Mohnen Rahimlan, PE, GE
<br />Material Testing Engineer
<br />Profile Summary
<br />Education: MS, Civil Engineering, Tehran University, Tehran
<br />Registration: Civil Engineer, Callfomia, No. 73396
<br />Geotechnioal Engineer, California, No. 3059
<br />Experience: 29 Years
<br />Mr. Mohsen Rahimlan possesses expertise In geotsohnlcal and material engineering, testing, Investiga-
<br />tion, design, and construction and has lent that expertise to a wide spectrum of public works projects. Mr.
<br />Rahlmian has substantial experience In conducting and managing geoteohnlcal and material testing and
<br />Inspection services during construction, He has performed diversified geotechnical assignments, including
<br />pavement design, shallow and deep foundation design, settlement evaluations, liquefaction studies, and
<br />i slope stability analyses. Mr. Rahimlan experience Includes geotechnical, civil, and structural design and
<br />construction management.
<br />Relevant Project Experience
<br />Emerald say Main Gate Safety Improvements, Emerald Bay Service District, Laguna Sesch, Callfor-
<br />nla. Geotechnloal Engineer responsible for quality assurance materials testing. Wiiidan provided civil and
<br />traffic engineering design and other appurtenant services for safety Improvements at the main gate an -
<br />trance. improvements involved road widening, guardhouse relocation and reconstruction; grading to accom-
<br />modate the roadway widening and landscaping; installing upgraded lighting, ADA -compliant curbs and
<br />ramps, and retaining and monument walls; widening the right -turn pocket and Installing a median; and In.
<br />stalling street striping and signage within Caltrans' right-of-way.
<br />Placentia Metrolink Station Phase I and 11, Orange County Transportation Authority, Orange County,
<br />California. Geotechnical Engineer responsible for quality assurancs materials testing required for Infra-
<br />structure Improvements for the new station. The project site involved approximately 4.75 acres to provide a
<br />Metrolink commuter rail statlon that meets current and future transit demand and ABA requirements. The
<br />project goal fostered train ridershlp growth In the region, The station was planned as part of a key compo-
<br />nent of transit-orlented development envisioned In the Westgate Specific Plan for the City of Placentia. The
<br />project Improvements Included street, railroad track, and pedestrian improvements; rail platforms; and light -
<br />Ing, signing and striping of four parking facilities for 425 vehicles.
<br />Orange Line Extension, Srutcco Engineering & Construction, ]no,/Los Angeles County Metropolitan
<br />Transportation Authority, Los Angeles, California. Geotechnical Englnaer responsible for quality assur-
<br />ancs materials testing required for the design/build of the MOL extension from the Chatsworth Station to
<br />Canoga Statlon In the San Fernando Valley along Canoga Avenue, Willdan prepared plans, specifications,
<br />and estimate for street widening, raised landscaped medians, Irrigation system, ADA access curb ramps,
<br />bicycle paths, park-and-ride and parking lot facilities, traffic signal modifications, communication conduits,
<br />,
<br />and signing and striping.
<br />Firestone Boulevard Capacity Enhancement, City of South Gats, California. Geotechnical Engineer
<br />responsible for quality assurance materials testing required for the corridor Improvements from Alameda
<br />Street to Hunt Avenue. The Improvements Involved roadway widening from four to six lanes; pavement re-
<br />habilitation; landscape and hardscape medians; median lighting; sidewalk, curb and gutter, and driveway
<br />i approach reconstruction; ADA -compliant ramps; parkway trees; artistic elements, corridor entrance monu-
<br />ment; bus shelter and bus turnouts; and traffic signal modifications. Services provided Included civil, traffic,
<br />pavement, and drainage engineering; landscape architecture, survey and right-of-way engineering; and util-
<br />ity relocation.
<br />-1
<br />WIN
<br />Comprehensive. Innovative. Trusted, proposal for Orn0a11 [Bgineering,
<br />_� .f .� RFP No. 17.083
<br />
|